Carrier 50CR- Manual
Carrier 50CR– Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – except
- Page 3 – Roof Curb for Small Cabinet; UNIT SIZE
- Page 4 – ode
- Page 8 – DETAIL
- Page 10 – TOP COVER
- Page 11 – Step 7—Install Electrical Connections; WARNING; UNIT COMPONENT DAMAGE HAZARD; CAUTION
- Page 16 – GROUND SCREW; NOTE
- Page 21 – HPS – High Pressure Switch; LEGEND; HPS – High Pressure Switch
- Page 23 – Table 3—; Table 4—; FILTER SIZE; Table 5—; CFM
- Page 24 – Table 6—; MAINTENANCE; ELECTRICAL SHOCK HAZARD; UNIT OPERATION HAZARD
- Page 25 – Infinity Top
- Page 26 – Balance Point Worksheet; Building Heat Loss, 1000BTUH; Based on Entering Indoor Air of 70 Deg. F and Rated CFM; Step 6—Refrigerant Circuit; obstructions, and that the air filter is clean.; Step 9—Pressure Switches; systems. R--22 pressure switches must not be used as replacements
- Page 27 – The Copeland scroll compressor uses Mobil 3MA POE oil. This; refrigerant cylinders contain a dip tube to allow liquid
- Page 28 – : Because these switches are attached to refrigeration system; : There is only one stub tube used with liquid header, and on; TROUBLESHOOTING; Unit Top; Detail A
1
50CR
Infinity
t
Single--Packaged Heat Pump Units
With Puron
®
(R--410A) Refrigerant
Sizes 024--060
Installation Instructions
NOTE
: Read the entire instruction manual before starting the
installation.
NOTE
: Installer: Make sure the Owner’s Manual and Service
Instructions are left with the unit after installation.
TABLE OF CONTENTS
Page
SAFETY CONSIDERATIONS
2
. . . . . . . . . . . . . . . . . . . . . . . .
INTRODUCTION
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
RECEIVING AND INSTALLATION
2--16
. . . . . . . . . . . . . . . .
Check Equipment
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Identify Unit
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Inspect Shipment
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Provide Unit Support
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Roof Curb
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Slab Mount
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Ground Mount
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Provide Clearances
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Rig and Place Unit
7
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Inspection
7
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Introduction
7
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Use of Rigging Bracket
7
. . . . . . . . . . . . . . . . . . . . . . . . . . .
Select and Install Ductwork
9
. . . . . . . . . . . . . . . . . . . . . . . . . .
Converting Horizontal Discharge Units to Downflow
(Vertical) Discharge Units
9
. . . . . . . . . . . . . . . . . . . . . . . . .
Provide for Condensate Disposal
9
. . . . . . . . . . . . . . . . . . . . .
Install Electrical Connections
11
. . . . . . . . . . . . . . . . . . . . . . .
High--Voltage Connections
11
. . . . . . . . . . . . . . . . . . . . . . .
Routing Power Leads Into Unit
11
. . . . . . . . . . . . . . . . . . . .
Connecting Ground Lead to Ground Screw
11
. . . . . . . . . .
Routing Control Wires
11
. . . . . . . . . . . . . . . . . . . . . . . . . .
Accessory Installation
16
. . . . . . . . . . . . . . . . . . . . . . . . . . .
Special Procedures for 208--v Operation
16
. . . . . . . . . . . . .
PRE--START--UP
17
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
START--UP
17
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Unit Start--Up
17--23
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Sequence of Operation
20
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Check for Refrigerant Leaks
20
. . . . . . . . . . . . . . . . . . . . . . . .
Start--Up Adjustments
20
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Checking Cooling and Heating Control Operation
20
. . . . .
Checking and Adjusting Refrigerant Charge
22
. . . . . . . . . .
Refrigerant Charge
22
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
No Charge
22
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Low Charge Cooling
22
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
To Use Cooling Charging Charts
22
. . . . . . . . . . . . . . . . . . .
Indoor Airflow and Airflow Adjustments
22
. . . . . . . . . . . .
Defrost Control
22
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Quiet Shift
22
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Defrost
22
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Emergency Heat/Cool Mode
22
. . . . . . . . . . . . . . . . . . . . . . . .
A05307
Fig. 1 -- Unit 50CR
MAINTENANCE
24--28
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Air Filter
25
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Indoor Blower and Motor
25
. . . . . . . . . . . . . . . . . . . . . . . . . .
Outdoor Coil, Indoor Coil, and Condensate Drain Pan
25
. . . .
Outdoor Fan
25
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Electrical Controls and Wiring
26
. . . . . . . . . . . . . . . . . . . . . .
Refrigerant Circuit
26
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Indoor Airflow
26
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Metering Devices–TXV & AccuRater
®
Piston
26
. . . . . . . . . .
Pressure Switches
26
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Loss--of--Charge Switch
27
. . . . . . . . . . . . . . . . . . . . . . . . . . .
High--Pressure Switch
27
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Copeland Scroll Compressor (Puron
®
Refrigerant)
27
. . . . . . .
Refrigerant System
27
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Refrigerant
27
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Compressor Oil
27
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Servicing Systems on Roofs with Synthetic Materials
27
. . .
Liquid--Line Filter Drier
28
. . . . . . . . . . . . . . . . . . . . . . . . .
Puron (R--410A) Refrigerant Charging
28
. . . . . . . . . . . . . .
System Information
28
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Loss--of--Charge Switch
28
. . . . . . . . . . . . . . . . . . . . . . . . .
Check Defrost Thermostat
28
. . . . . . . . . . . . . . . . . . . . . . . .
TROUBLESHOOTING
28
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
START--UP CHECKLIST
28
. . . . . . . . . . . . . . . . . . . . . . . . . . .
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Other Manuals for Carrier 50CR
Summary
2 SAFETY CONSIDERATIONS Installation and servicing of this equipment can be hazardous due to mechanical and electrical components. Only trained and qualifiedpersonnel should install, repair, or service this equipment.Untrained personnel can perform basic maintenance functions suchas cleaning and rep...
3 Gask et around outer edge Insulateddeck pan Gask et around duct S/A R/A HVAC unit base *Gask eting outer flange Flashing field supplied Roofing material field supplied Cant str ip field supplied *Provided with roof curb Roof Ductwork field supplied Insulation (field supplied) Roof curb* Wood naile...
4 A B C MAXIMUM ALLOWABLE DIFFERENCE (in.) A-B B-C A-C 1/4 1/4 1/4 C99065 Fig. 3 -- Unit Leveling Tolerances OPTIONAL RETURN AIR OPENING OPTIONAL SUPPLY AIR OPENING EVAP. COIL COND. COIL 2" C99096 Fig. 4 -- Slab Mounting Detail A06114 Fig. 5 -- Corner Weights (Lbs.) CORNER WEIGHTS (SMALL CABINET...