Carrier 48TC**16- Manual

Carrier 48TC**16

Carrier 48TC**16– Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
Page: / 48

Table of Contents:

  • Page 2 – SAFETY CONSIDERATIONS; WARNING
  • Page 4 – INSTALLATION; Jobsite Survey; Step 1 — Plan for Unit Location; NOTE
  • Page 5 – COMPONENT; Step 2 — Plan for Sequence of Unit Installation; Ductwork must be attached to curb and
  • Page 7 – Step 5 — Field Fabricate Ductwork; Do not connect ductwork to unit.; PROPERTY DAMAGE HAZARD; Step 6 — Rig and Place Unit; UNIT DAMAGE HAZARD; CAUTION; DETAIL “A”
  • Page 8 – Step 7 — Convert to Horizontal and Connect; without
  • Page 9 – Step 8 — Install Outside Air Hood; Factory Option —; Economizer Hood and Two–Position Hood; Two Position Damper Hood Removal and Setup --; Economizer Hood and Two–Position
  • Page 10 – Be careful not; Step 9 — Install Flue Hood
  • Page 11 – Step 10 — Install Gas Piping; UNIT; EQUIPMENT DAMAGE HAZARD
  • Page 12 – Option
  • Page 13 – Step 11 — Install External Condensate Trap and
  • Page 14 – All units must have an external trap for condensate; Step 12 — Make Electrical Connections; ELECTRICAL SHOCK HAZARD; Do not use gas piping as an electrical ground.
  • Page 15 – FIRE HAZARD; to be connected to a 208-v power supply, the control
  • Page 16 – Convenience Outlets —; Convenience Outlet Utilization
  • Page 17 – ELECTRICAL OPERATION HAZARD; Installing
  • Page 19 – Heat Anticipator Settings —
  • Page 20 – Control Connections
  • Page 21 – Adaptive Dehumidification System Humidistat Wiring; with EDGE Pro Thermidistat Device
  • Page 22 – PremierLink
  • Page 25 – Temperature (SAT) Sensor on Small Rooftop Units; Field Connections; Table 3 – PremierLink Sensor Usage; NOTES
  • Page 27 – Space Sensors —; Connect Thermostat —
  • Page 28 – Economizer Controls; COVER REMOVED
  • Page 29 – Sensor Connections; UNIT PERFORMANCE HAZARD; Io; Humidistat connections:
  • Page 30 – Filter Status Switch —; Supply Fan Status Switch —; CTB; Connection; Connection
  • Page 31 – CCN Bus
  • Page 32 – RTU Open Control System
  • Page 35 – Table 8 – RTU Open Controller Inputs and Outputs
  • Page 36 – Indoor Air Quality (CO
  • Page 38 – Relative Humidity Sensor
  • Page 39 – RTU Open Controller Integration Guide; SW3 Protocol Selection; PROTOCOL; Baud Rate Selections; BAUD RATE
  • Page 40 – Local Access —; BACview; Handheld Connections
  • Page 41 – Table 9 – LEDs; Tx; RTU Open; Outdoor Air Enthalpy Control; Differential Enthalpy Control —
  • Page 42 – Smoke Detectors
  • Page 43 – Smoke Detector Locations
  • Page 44 – Completing Installation of Return Air Smoke Sensor:; Sampling Tube; Additional Application Data —
  • Page 45 – Table 10 – Unit Wire/Fuse or HACR Breaker Sizing Data; UN; Legend and Notes for Table 10
  • Page 46 – IV Wiring; Step 13 — Adjust Factory--Installed Options; Smoke Detectors —; Step 14 — Install Accessories
Loading the manual

48TC**16

Single Package Rooftop

Gas Heating/Electric Cooling Unit

with Puron

r

(R --- 410A) Refrigerant

Size 16

Installation Instructions

NOTE

: Read the entire instruction manual before starting

the installation

TABLE OF CONTENTS

SAFETY CONSIDERATIONS

2

. . . . . . . . . . . . . . . . . . . .

INSTALLATION

4

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Jobsite Survey

4

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Step 1 -- Plan for Unit Location

4

. . . . . . . . . . . . . . . . . .

Roof Mount

5

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Step 2 -- Plan for Sequence of Unit Installation

5

. . . . . .

Curb--Mount Installation

5

. . . . . . . . . . . . . . . . . . . . .

Pad--Mount Installation

5

. . . . . . . . . . . . . . . . . . . . . .

Frame--Mount Installation

5

. . . . . . . . . . . . . . . . . . . .

Step 3 -- Inspect Unit

5

. . . . . . . . . . . . . . . . . . . . . . . . . . .

Step 4 -- Provide Unit Support

5

. . . . . . . . . . . . . . . . . . .

Roof Curb Mount

5

. . . . . . . . . . . . . . . . . . . . . . . . . .

Slab Mount (Horizontal Units Only)

5

. . . . . . . . . . .

Alternate Unit Support

(In Lieu of Curb or Slab Mount)

5

. . . . . . . . . . . . . .

Step 5 -- Field Fabricate Ductwork

7

. . . . . . . . . . . . . . . .

Step 6 -- Rig and Place Unit

7

. . . . . . . . . . . . . . . . . . . . .

Positioning on Curb

8

. . . . . . . . . . . . . . . . . . . . . . . .

Step 7 -- Convert to Horizontal and Connect Ductwork

8

. . .

Step 8 -- Install Outside Air Hood

9

. . . . . . . . . . . . . . . .

Economizer Hood Removal and Setup —

Factory Option

9

. . . . . . . . . . . . . . . . . . . . . . . . . . . .

Two Position Damper Hood Removal and Setup —

Factory Option

9

. . . . . . . . . . . . . . . . . . . . . . . . . . . .

Economizer Hood and Two--Position Hood

10

. . . . .

Step 9 -- Install Flue Hood

10

. . . . . . . . . . . . . . . . . . . . .

Step 10 -- Install Gas Piping

11

. . . . . . . . . . . . . . . . . . . .

Factory--Option Thru--Base Connections

(Gas Connections)

11

. . . . . . . . . . . . . . . . . . . . . . . . .

Step 11 -- Install External Condensate Trap and Line

13

. .

Step 12 -- Make Electrical Connections

14

. . . . . . . . . . .

Field Power Supply

14

. . . . . . . . . . . . . . . . . . . . . . . .

All Units

15

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Units without Factory--Installed Disconnect

15

. . . .

Units with Factory--Installed Disconnect

15

. . . . . . .

Convenience Outlets

16

. . . . . . . . . . . . . . . . . . . . . . .

Factory--Option Thru--Base Connections

(Electrical Connections)

18

. . . . . . . . . . . . . . . . . . . .

Units without Thru--Base Connections

18

. . . . . . . . .

Field Control Wiring

18

. . . . . . . . . . . . . . . . . . . . . . .

Thermostat

18

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Unit without Thru--Base Connection Kit

19

. . . . . . .

Heat Anticipator Settings

19

. . . . . . . . . . . . . . . . . . .

Humidi--MiZer

R

Control Connections

20

. . . . . . . . . .

Humidi--MiZer -- Space RH Controller

20

. . . . . . . .

PremierLink

t

(Factory Option)

21

. . . . . . . . . . . . . . . . .

Supply Air Temperature (SAT) Sensor

25

. . . . . . . . .

Outdoor Air Temperature (OAT) Sensor

25

. . . . . . .

EconoMi$er2

25

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Field Connections

25

. . . . . . . . . . . . . . . . . . . . . . . . . .

Space Sensors

27

. . . . . . . . . . . . . . . . . . . . . . . . . . . .

Connect Thermostat

27

. . . . . . . . . . . . . . . . . . . . . . .

Configure the Unit for Thermostat Mode

27

. . . . . .

Economizer Controls

28

. . . . . . . . . . . . . . . . . . . . . . . .

Indoor Air Quality (CO

2

sensor)

28

. . . . . . . . . . . . .

Outdoor Air Quality Sensor

28

. . . . . . . . . . . . . . . . .

Space Relative Humidity Sensor or

Humidistat Connections

29

. . . . . . . . . . . . . . . . . . . .

Smoke Detector/Fire Shutdown (FSD)

30

. . . . . . . . .

Filter Status Switch

30

. . . . . . . . . . . . . . . . . . . . . . . .

Supply Fan Status Switch

30

. . . . . . . . . . . . . . . . . . .

Remote Occupied Switch

30

. . . . . . . . . . . . . . . . . . .

Power Exhaust (output)

30

. . . . . . . . . . . . . . . . . . . . .

CCN Communication Bus

31

. . . . . . . . . . . . . . . . . .

RTU Open Control System

32

. . . . . . . . . . . . . . . . . . . . .

Supply Air Temperature (SAT) Sensor

35

. . . . . . . . .

Outdoor Air Temperature (OAT) Sensor

35

. . . . . . .

EconoMi$er2

35

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Field Connections

35

. . . . . . . . . . . . . . . . . . . . . . . . . .

Space Temperature (SPT) Sensors

36

. . . . . . . . . . . .

Indoor Air Quality (CO

2

) Sensor

36

. . . . . . . . . . . . .

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Other Manuals for Carrier 48TC**16

Summary

Page 2 - SAFETY CONSIDERATIONS; WARNING

2 Outdoor Air Quality Sensor 37 . . . . . . . . . . . . . . . . . Space Relative Humidity Senor or Humidistat 37 . . Smoke Detector/Fire Shutdown (FSD) 38 . . . . . . . . . Connecting Discrete Inputs 38 . . . . . . . . . . . . . . . . . . Communication Wiring -- Protocols 39 . . . . . . . . . . . . ...

Page 4 - INSTALLATION; Jobsite Survey; Step 1 — Plan for Unit Location; NOTE

4 C10862A Fig. 1 -- Unit Dimensional Drawing – 16 Size Unit (cont.) INSTALLATION Jobsite Survey Complete the following checks before installation. 1. Consult local building codes and the NEC (National Electrical Code) ANSI/NFPA 70 for special installa- tion requirements. 2. Determine unit location (...

Page 5 - COMPONENT; Step 2 — Plan for Sequence of Unit Installation; Ductwork must be attached to curb and

5 Roof Mount — Check building codes for weight distribution requirements. Unit operating weight is shown in Table 1. Table 1 – Operating Weights 48TC**16 COMPONENT UNITS LB (KG) Base Unit 1380 (627) Economizer Vertical 100 (45) Horizontal 115 (52) Humidi --- MiZer R System 62 (28) Powered Outlet 32 ...

Other Carrier Models