Carrier 48HC- User Manual

Carrier 48HC

Carrier 48HC– User Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
51 Page 51
52 Page 52
Page: / 52

Table of Contents:

  • Page 2 – SAFETY CONSIDERATIONS; WARNING
  • Page 9 – INSTALLATION; Jobsite Survey; Step 1 — Plan for Unit Location; NOTE
  • Page 10 – Roof Curb Mount —; Ductwork must be attached to curb and
  • Page 14 – MAXIMUM ALLOWABLE; Step 5 — Field Fabricate Ductwork; Do not connect ductwork to unit.; PROPERTY DAMAGE HAZARD; Step 6 — Rig and Place Unit; UNIT DAMAGE HAZARD; CAUTION; DETAIL A
  • Page 15 – Positioning on Curb —; gas regulators, and gas relief equipment. Minimum distance; Step 7 — Horizontal Duct Connection; Supply; Step 8 — Install Outside Air Hood — Factory; To remove the hood parts package:
  • Page 16 – Step 9 — Install Flue Hood and Combustion Air; Step 10 — Install Gas Piping; For natural gas applications, gas pressure at unit gas; Gas Supply Line —
  • Page 17 – Table 2 – Typical; Table 3 – Natural Gas Supply Line Pressure Ranges
  • Page 19 – All units must have an external trap for condensate; Step 12 — Make Electrical Connections; ELECTRICAL SHOCK HAZARD; Do not use gas piping as an electrical ground.; DETAIL
  • Page 20 – Units Without Disconnect Option
  • Page 22 – Field Control Wiring —
  • Page 23 – Central; Failure to follow this caution may cause a short circuit.; to be connected to a 208-v power supply, the control
  • Page 24 – Control Connections
  • Page 25 – Adaptive Dehumidification System Humidistat Wiring; with EDGE Pro Thermidistat Device
  • Page 26 – PremierLink
  • Page 29 – Field Connections; Table 4 – PremierLink Sensor Usage; NOTES
  • Page 31 – Space Sensors —; SEN; SET; Connect Thermostat —
  • Page 32 – Economizer Controls; COVER REMOVED
  • Page 33 – Sensor Connections; UNIT PERFORMANCE HAZARD; Io; Humidistat connections:
  • Page 34 – CTB
  • Page 35 – CCN Bus
  • Page 36 – RTU Open Control System
  • Page 39 – Table 9 – RTU Open Controller Inputs and Outputs
  • Page 40 – Indoor Air Quality (CO
  • Page 42 – Relative Humidity Sensor; Connecting Discrete Inputs —
  • Page 43 – RTU Open Controller Integration Guide; SW3 Protocol Selection; PROTOCOL; Baud Rate Selections; BAUD RATE
  • Page 44 – Cable; Handheld Connections
  • Page 45 – RTU Open; Outdoor Air Enthalpy Control; Differential Enthalpy Control —
  • Page 46 – Wiring; Smoke Detectors; Return Air Sensor Tube Installation –
  • Page 48 – : See page 49 for table legend and notes.
  • Page 49 – Legend and Notes for Table 11; IMPORTANT
  • Page 50 – IV Wiring; Step 13 — Adjust Factory--Installed Options; EconoMi$er IV Occupancy Switch —; Step 14 — Install Accessories
Loading the manual

48HC

Single Package Rooftop

Gas Heating/Electric Cooling Unit

with Puron

r

(R --- 410A) Refrigerant

Sizes: 17, 20, 24, 28

Installation Instructions

NOTE

: Read the entire instruction manual before starting

the installation

TABLE OF CONTENTS

SAFETY CONSIDERATIONS

2

. . . . . . . . . . . . . . . . . . . .

INSTALLATION

9

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Jobsite Survey

9

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Step 1 -- Plan for Unit Location

9

. . . . . . . . . . . . . . . . . .

Roof Mount

9

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Step 2 -- Plan for Sequence of Unit Installation

10

. . . . .

Curb--Mount Installation

10

. . . . . . . . . . . . . . . . . . . .

Pad--Mount Installation

10

. . . . . . . . . . . . . . . . . . . . .

Frame--Mount Installation

10

. . . . . . . . . . . . . . . . . . .

Step 3 -- Inspect Unit

10

. . . . . . . . . . . . . . . . . . . . . . . . . .

Step 4 -- Provide Unit Support

10

. . . . . . . . . . . . . . . . . .

Roof Curb Mount

10

. . . . . . . . . . . . . . . . . . . . . . . . .

Slab Mount (Horizontal Units Only)

10

. . . . . . . . . .

Alternate Unit Support

(In Lieu of Curb or Slab Mount)

10

. . . . . . . . . . . . .

Step 5 -- Field Fabricate Ductwork

14

. . . . . . . . . . . . . . .

Step 6 -- Rig and Place Unit

14

. . . . . . . . . . . . . . . . . . . .

Positioning on Curb

15

. . . . . . . . . . . . . . . . . . . . . . .

Step 7 -- Horizontal Duct Connection

15

. . . . . . . . . . . .

Step 8 -- Install Outside Air Hood — Factory Option

15

. .

Step 9 -- Install Flue Hood and Combustion Air Hood

16

. .

Step 10 -- Install Gas Piping

16

. . . . . . . . . . . . . . . . . . . .

Gas Supply Line

16

. . . . . . . . . . . . . . . . . . . . . . . . . .

Factory--Option Thru--Base Connections

18

. . . . . . .

Step 11 -- Install External Condensate Trap and Line

19

. .

Step 12 -- Make Electrical Connections

19

. . . . . . . . . . .

Field Power Supply

19

. . . . . . . . . . . . . . . . . . . . . . . .

Units without Factory--Installed Disconnect

20

. . . .

Units with Factory--Installed Disconnect

20

. . . . . . .

All Units

20

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Convenience Outlets

20

. . . . . . . . . . . . . . . . . . . . . . .

Factory--Option Thru--Base Connections

22

. . . . . .

Units without Thru--Base Connections

22

. . . . . . . . .

Field Control Wiring

22

. . . . . . . . . . . . . . . . . . . . . . .

Thermostat

22

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Unit without Thru--Base Conversion Kit

22

. . . . . . .

Heat Anticipator Settings

23

. . . . . . . . . . . . . . . . . . .

Transformer Connection

for 208--v Power Supply

23

. . . . . . . . . . . . . . . . . . . . .

Humidi--MiZer

R

Control Connections

24

. . . . . . . . . .

Humidi--MiZer -- Space RH Controller

24

. . . . . . . .

PremierLink

t

(Factory Option)

26

. . . . . . . . . . . . . . .

Supply Air Temperature (SAT) Sensor

29

. . . . . . . . .

Outdoor Air Temperature (OAT) Sensor

29

. . . . . . .

EconoMi$er2

29

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Field Connections

29

. . . . . . . . . . . . . . . . . . . . . . . . . .

Space Sensors

31

. . . . . . . . . . . . . . . . . . . . . . . . . . . .

Connect Thermostat

31

. . . . . . . . . . . . . . . . . . . . . . .

Configure the Unit for Thermostat Mode

31

. . . . . .

Economizer Controls

32

. . . . . . . . . . . . . . . . . . . . . . . .

Indoor Air Quality (CO

2

) Sensor

32

. . . . . . . . . . . . .

Outdoor Air Quality Sensor

32

. . . . . . . . . . . . . . . . .

Space Relative Humidity Sensor or

Humidistat Connections

33

. . . . . . . . . . . . . . . . . . . .

Smoke Detector/Fire Shutdown (FSD)

34

. . . . . . . . .

Filter Status Switch

34

. . . . . . . . . . . . . . . . . . . . . . . .

Supply Fan Status Switch

34

. . . . . . . . . . . . . . . . . . .

Remote Occupied Switch

34

. . . . . . . . . . . . . . . . . . .

Power Exhaust (output)

34

. . . . . . . . . . . . . . . . . . . . .

CCN Communication Bus

35

. . . . . . . . . . . . . . . . . .

RTU Open Control System

36

. . . . . . . . . . . . . . . . . . .

Supply Air Temperature (SAT) Sensor

39

. . . . . . . . .

Outdoor Air Temperature (OAT) Sensor

39

. . . . . . .

EconoMi$er2

39

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Other Manuals for Carrier 48HC

Summary

Page 2 - SAFETY CONSIDERATIONS; WARNING

2 Field Connections 39 . . . . . . . . . . . . . . . . . . . . . . . . . . Space Temperature (SPT) Sensors 40 . . . . . . . . . . . . Indoor Air Quality (CO 2 ) Sensor 40 . . . . . . . . . . . . . Outdoor Air Quality Sensor 41 . . . . . . . . . . . . . . . . . Space Relative Humidity Sensor or Humid...

Page 9 - INSTALLATION; Jobsite Survey; Step 1 — Plan for Unit Location; NOTE

9 INSTALLATION Jobsite Survey Complete the following checks before installation. 1. Consult local building codes and the NEC (National Electrical Code) ANSI/NFPA 70 for special installa- tion requirements. 2. Determine unit location (from project plans) or select unit location. 3. Check for possible...

Page 10 - Roof Curb Mount —; Ductwork must be attached to curb and

10 Step 2 — Plan for Sequence of Unit Installation The support method used for this unit will dictate different sequences for the steps of unit installation. For example, on curb--mounted units, some accessories must be installed on the unit before the unit is placed on the curb. Review the followin...