Carrier 30GT- User Manual
Carrier 30GT– User Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – To; ensure proper closing, install the bypass valve; q 2pJ
- Page 3 – Wires between field-installed components and unit; Two
- Page 4 – A . C O N N E C T I O N S F O R S I N G L E - C O M P R E S S O R; Hot Gas Bypass Field Wiring; OPERATION AND ADJUSTMENT; Hot Gas Bypass; COMBINED LEGEND
HEATING
30GT
K,HL
S A F E T Y C O N S I D E R A T I O N S
Installing, starting-up and servicing air conditioning
equipment can be hazardous due to system pressures,
electrical components and equipment location,
Only trained, qualified installers and service techni-
cians should install, start up and service this equipment.
When working on air conditioning equipment, observe
precautions in the literature and on tags, stickers and
labels attached to the equipment.
Follow all safety codes. Wear safety glasses and work
gloves. Use care in handling equipment.
I N T R O D U C T I O N
These instructions cover field installation of the Acces-
sory Hot Gas B y ass Valve and solenoid pilot valve on
the following chi lers:
through 060 (50 and 60 Hz)
(60 Hz), Flotronic’”
(50 Hz), Flotronic’”
through 200 (50 and 60 Hz), Flotronic’”
(60 Hz)
(50 Hz)
On Flotronic chillers with no unloaders or 2 unloaders,
the accessory hot gas bypass must be added to
both
circuits because of
automatic lead-lag feature.
INSTALLATION
S t e p 1
Examine
e Contents
Pack-
age includes hot gas bypass va ve, solenoid pilot valve
and instructions. Examine each item. If any part is
damaged or missing, file a claim immediately with the
shipping agent.
Step 2
Install Piping
T X V
- - -
a
- - -
C O O L E R
SUCTION LINE
L I N E
LINE
(C
I
R C
UI
T
I
I
STUB
(SEALED FROM
F A C T O R Y
B Y P A S S V A L V E
S E E
N O T E 2
SEE NOTE I
F R O M F A C T O R Y
FIELD-SUPPLIED BYPASS LINE
H O T
G A S D I S C H A R G E
C O N D E N S E R
T H E R M O S T A T I . C E X P A N S I O N
V A L V E
FACTORY PIPING
PIPING
NOTES:
1. %-in. OD for
and 30GT;
OD for 30GB.
2. The bypass valve this package has %-in. connections and can
be
used directly on
and 30GT units.
3. On 30GB units, a change from
to
must be made either at the valve or
at
the stubs.
Fig. 1
S c h e m a t i c P i p i n g ;
M a n u f a c t u r e r r e s e r v e s t h e r i g h t t o d i s c o n t i n u e , o r c h a n g e a t a n y t i m e , s p e c i f i c a t i o n s o r d e s i g n s w i t h o u t n o t i c e a n d w i t h o u t i n c u r r i n g o b l i g a t i o n s .
P C 1 1 1
C a t a l o g N o .
533-039
P r i n t e d i n U . S . A .
F o r m
SI
2-89
Replaces:
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Other Manuals for Carrier 30GT
Summary
UNITS and (See Fig. 1.) Line Connect the field-supplied line to the factory-provided stubs in the discharge line the circuit no. 1 compressor and in the no. line, between expansion valve and cooler (stubs are sealed from factory). Bypass Valve Install the valve in the line as close to the cooler as ...
Step 3 Dehydrate and Recharge Circuit W h e n piping has been completed, leak test the assemblyand replace the filter drier, or core(s) for circuit no. 1.On single-compressor chillers 15,025 and 030 for 60 Hz, 020,025 for 50 Hz; 30GT) the filter drier itself must be replaced. After core (or drier) r...
ALL FLOTRONIC UNITS Units require control r e l a y s tained R) and Time Delay Module. They may be ob- rom your Carrier distributor under the following Carrier Part Numbers: and R2 R 3 Time Delay Module 115-v 24-v DPDTDPDT H N 6 1 K K 0 4 0 DPDT UNITS T H R O U G H 060 ( E x c e p t 020, 60 Hz, and ...