Weil-McLain 6-20 Series - Manuals
Weil-McLain 6-20 Series – Manual in PDF format online.
Manuals:
Manual Weil-McLain 6-20 Series
Summary
Part Number 550-141-816/0798 2 LGB-6 to LGB-20 Series 2 – Control Supplement I New installation 1. Remove all burners from base box assembly. Remove 3.95 mm natural gas main burner orifices in manifold. Install 2.40 mm propane gas main burner orifices. Use pipe dopesparingly only on male ends. Use p...
Part Number 550-141-816/0798 3 CSD-1 Control System – Propane gas Figure 1 Pilot burner assembly, typical Figure 2 Main flame sensor assembly I New installation – continued
Part Number 550-141-816/0798 4 LGB-6 to LGB-20 Series 2 – Control Supplement 1. These instructions are for use with Propane Control Cartons as listed in Gas Control Arrangement, Table 2 (page 2). 2. Remove jacket door(s) and access panel(s).3. Disconnect wiring and tubing from existing pilot burner ...