Page 3 - Determine the volume of space — ft; ft; Divide the volume of space by 50 ft; to; CODES; all operating appliances in the space.
NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE. 3 Use the following equations to determine ifyou have a confined or unconfined space. 1. Determine the volume of space — ft 3 . Length x Width x Height = _____ ft 3 (Include adjoining rooms with doorless pas-sageways or ventilation grills betweenrooms....
Page 4 - LOCATION OF FIREBOX; Figure 1 for location suggestions.; Clearances; Ensure the minimum clearances shown in; Figure 2; Not to Scale
NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE. 4 WARNING: IF THE AREA IN WHICH THEHEATER MAY BE OPERATED IS SMALLERTHAN THAT DEFINED AS AN UNCON-FINED SPACE, PROVIDE ADEQUATECOMBUSTION AND VENTILATION AIR BYONE OF THE METHODS DESCRIBED INTHE NATIONAL FUEL GAS CODE, ANSIZ223.1 1992, SECTION 5.3 OR A...
Page 5 - ASSEMBLY STEPS; Figure 3; Consult all local codes.
NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE. 5 Install only a ¹⁄₂ " (1 ¹⁄₂ " max.) inside diameter approved gas line through the firebox wall forconnection to the unvented room heater insidethe firebox. Ensure that a sediment trap is installed in theexisting gas line, if not, install a se...
Page 6 - Construct firebox framing following
NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE. 6 UVF-500 SPECIFICATIONS Figure 4 Firebox Framing Construct firebox framing following Figures 6 through 8 and the chart on page 8 for yourspecific installation requirements. Refer toFigures 4 and 5 on pages 6 and 7 for fireboxdimensions. The firebox ma...
Page 7 - Firebox Installation; Figures 6 through 10; UVF-600 SPECIFICATIONS
NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE. 7 Firebox Installation Note: The firebox must be installed giving fullconsideration to the clearance and height re-quirements identified in this manual. Step 1. Slide the firebox into prepared framingor position firebox in its final position andframe l...
Page 8 - FRAMING SPECIFICATIONS; Figure 6; Framing Dimensions
NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE. 8 FRAMING SPECIFICATIONS Figure 6 Figure 7 Figure 8 Opening UVF-500 UVF-600 A 41 ¹⁄₄ " 46 ¹⁄₄ " B 37 ¹⁄₂ " 43 ¹⁄₂ " C 27 ¹⁄₂ " 31 ³⁄₄ " D 13 ³⁄₄ " 15 ⁷⁄₈ " E 66 ³⁄₄ " 73" F 33 ³⁄₈ " 36 ¹⁄₂ " G 19 ⁵⁄₈ "...
Page 9 - Step 3. Replace the screws previously removed.; OPTIONAL EQUIPMENT; Circulating Models Only; Canopy Installation; Figure 9; Blower Kit Installation; Blower Motor
NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE. 9 Step 2. Align the canopy with the holes in thetop frame. Step 3. Replace the screws previously removed. Step 4. Tighten side screws. Make sure thecanopy is level and secure. OPTIONAL EQUIPMENT Blower Kit Circulating Models Only If you are installing ...
Page 10 - ACCESSORIES AND COMPONENTS; Decorative Volcanic Stone
NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE. 10 ACCESSORIES AND COMPONENTS Blower Kits-Single Speed 80L84 FBK-100 -Variable Speed 80L85 FBK-200 (FBK-200 Models Only) Decorative Volcanic Stone 80L42 FDVS Decorative Volcanic Stone The decorative volcanic stone, Model FDVS,can be used to enhance the...
Page 11 - REPLACEMENT PARTS; DESCRIPTION; Gas Fireplace Assembly
NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE. 11 REPLACEMENT PARTS UVF-500 UVF-600 No. DESCRIPTION Part No. Qty. Part No. Qty. Gas Fireplace Assembly – – – – 1. Firescreen 36L89 2 36L99 2 2. Rod, Screen 88L95 2 88L96 2 3. Refractory, Side 88L59 2 88L65 2 4. Refractory, Rear 88L58 1 88L64 1 5. Refr...