Page 2 - Contents; CONFIGURATION AND MANAGEMENT
Contents 1.0 INSTALLATION 1.1 Unpack and Inspect the Equipment 1.2 Select a Site for Installation 1.2.1 Tabletop 1.2.2 Rack 1.3 Install Your Management Module 1.3.1 Install an Uplink Module on the Management Module 1.3.2 Identify the Appropriate Slot for Installation 1.3.3 Align the Management Modul...
Page 3 - Unpack and Inspect the Equipment; The following components should be included:; Select a Site for Installation; bottom edges of the chassis are not blocked.; CHASSIS SPECIFICATIONS; OPERATING REQUIREMENTS
1.0 INSTALLATION 1.1 Unpack and Inspect the Equipment The following components should be included: If there is visible damage, do not attempt to connect the device. Contact Customer Support: customers in Europe, the Middle East and Africa please call 44-0-1635- 570953 or email support-emea@nettonet....
Page 5 - Install Your Management Module; Install an Uplink Module on the Management Module
1.3 Install Your Management Module A management module provides the functional control for Net to Net Technologies' IPD4000E; the IPD4000E cannot function without one. There are several different models available for purchase: refer to http://www.nettonet.com/products for further information or cont...
Page 6 - Slide the Management Module Firmly into the Chassis; models available for purchase visit
1.3.4 Slide the Management Module Firmly into the Chassis Tighten the fastening screws on the management module faceplate by turning them clockwise with a Phillips screwdriver. Be careful NOT TO OVER-TIGHTEN the screws. 1.4 Install Your Interface Module(s) Interface modules provide the subscriber co...
Page 7 - Align the Interface Module with the Slot Module Guides; chosen slot on the IPD4000E.; Slide the Interface Module Firmly into the Chassis
1.4.2 Align the Interface Module with the Slot Module Guides With the interface module PCB facing UP and the interface module model name, and Net to Net logo, on the RIGHT side of the module faceplate (facing towards you), align the left and right edges of the PCB with the slot module guides of the ...
Page 8 - cumulative between the two.
1.5.1 Establish a Ground Connection 1.5.1.1 Connect a Ground Wire to the IPD4000E Line up the 2-hole terminal lug of your ground wire with the two holes on the small, unpainted section on the back of your chassis. Secure the terminal lug to the chassis with two #10-32 screws. 1.5.1.2 Connect the Gro...
Page 9 - DC POWER SPECIFICATIONS
1.5.3 Establish a Power Connection 1.5.3.1 Connect Your Positive Power Lead to the Terminal Block Using a Phillips Screwdriver, remove the upper screw from the chosen terminal block (labeled "+" on the chassis). Slide the ring terminal of your positive power lead around the shaft of the scre...
Page 10 - Establish Your Uplink Connections; instructions of your particular UIM or MIM model at
1.5.3.3 Connect Both Power Leads to a Fuse Panel The negative (-) lead connects to a "Batt" (Battery) terminal and the positive (+) lead connects to a "Return" terminal on your DC power supply. 1.5.4 Verify the Connection Turn your power source(s) on . The PWR (power) LED on both the...
Page 11 - Connect Your Subscriber Lines
1.7 Connect Your Subscriber Lines The IPD4000E chassis supports ADSL, IDSL, SDSL and T1/E1 technologies. Ensure that the subscriber lines you are connecting correspond with the technology of the interface module(s) installed in your IPD4000E. 1.7.1 Identify the Appropriate RJ21 Connector(s) Subscrib...
Page 14 - for specific information such as; Secure the Connecting Cables; loose from the chassis secure with cable ties or velcro straps.; CONFIGURATION AND MANAGEMENT; Refer to the following documentation at; DOCUMENT; management module installation instructions
http://www.nettonet.com/support/docs for specific information such as connector pinouts, parameter configurations and distance capabilities. 1.8 Secure the Connecting Cables Position all connecting cables such that they will not become a tripping hazard or pull loose from the chassis; secure with ca...
Page 15 - ADDITIONAL INFORMATION; Technical Support
3.0 ADDITIONAL INFORMATION 3.1 Fan Module The IPD4000E fan module is installed vertically to the right of the interface module slots. It comes pre-installed and should not be removed unless it is being replaced. Fan functionality is indicated by a FAN LED on your management module (all models): NO i...
Page 16 - Regulatory Compliance; CUSTOMER LOCATION; Europe, Middle East and Africa
Frequently Asked Questions Net to Net Enterprise MIBs Product Discontinuation Notices Product Documentation Visio Network Diagram Stencils 3.3.2 Technical Support Engineers If you are unable to locate the answers to your questions online, please contact Net to Net Technologies' Technical Support Dep...