Page 3 - CHAPTER I; Figure 1. Heater Major Components
GAS CONTROLVALVE POWERPILEGENERATOR EXHAUSTVENT BASIC HEATER WALL MOUNTINGBRACKET THERMOSTATCABLE THERMOSTAT CHAPTER I INTRODUCTION 1. EQUIPMENT This heater is the consumer version of a highly success- ful, thoroughly tested, gas fired, infrared, industrial utility heater.This heater does not requir...
Page 4 - from heater components to combustible materials,; GENERAL INFORMATION; See Tables 1 and 2 for heater specifications:; Clearances to Combustible Surfaces; Table 1. BTU Ratings and Supply Pressures
• Chapter 2 provides heater installation requirementsand information, such as: a) minimum distances from heater components to combustible materials, b) heater mounting requirements, c) venting requirements, d) fuel supply requirements, e) thermostat mounting. • Chapter 3 covers startup, operation, a...
Page 5 - CHAPTER II; GENERAL INSTALLATION INFORMATION; Figure 2. Installation Clearances to Combustible Surfaces
Provide adequate clearance to combustibles per Table 3 atcontrol end of heater for servicing and minimum on top andsides for ventilation and combustion air supply.A minimum clearance of 8’ above floor for public garages inaccordance with NFPA No. 88 most recent edition, orFigure 1; whichever is larg...
Page 6 - HEATER MOUNTING INSTRUCTIONS; A. Determine how you wish to install the vent based on
• This heater may be mounted on any wall;however, it is recommended that the heater bemounted in the middle of the wall opposite anyoverhead doors. • When selecting installation locations for thisheater ensure that the opening of any exterior orinterior doors or windows will not violate mini-mum cle...
Page 7 - Figure 3. Heater Mounting Information
B. Prepare to install the heater wall mounting bracket as follows:1. If the wall mounting bracket is to be attached to a stud and wallboard wall, refer to Figure 3 fordimensions, locate a stud, and drill two 1/8" pilotholes into the stud centerline. Use template forsimplified installation. 2. If...
Page 8 - Figure 4. Connection Diagram
LEAVE 2 THREADS BARE USE MODERATE AMOUNT OF PIPE DOPE 3/4” MAXIMUM THREAD LENGTH 1/2” BLACK PIPE GAS VALVE BODY 1/2” MAXIMUM DEPTH OF INSERTS INTO GAS VALVE Refer to National Electrical Code NFPA70-1993 and for Canadian installations to current CODE C22.1- 3. CONNECTING HEATER TO GAS SUPPLY WARNING:...
Page 9 - WARNING; Figure 7. Typical Piping Installation
ments and piping requirements are fulfilled, install pipingas follows: A. In accordance with the above piping requirements, assemble piping, sediment trap, shutoff valve, andnecessary fittings. Tighten all components securely. WARNING : Failure to ensure that male threads on pipe to be installed int...
Page 10 - Figure 9. Gas Valve Components; CHAPTER III; OPERATING SAFETY INSTRUCTIONS; FIGURE 8. THERMOSTAT CONTROLS
MANUAL GAS CONTROL KNOB PILOTSTAT POWER UNIT PRESSUREREGULATORADJUSTMENT STANDARDPRESSUREREGULATOR PILOT GAS OUTLET(PRESSURE TAPPINGDIRECTLY BENEATH) PILOT FLOW ADJUSTING SCREW(BENEATH COVER SCREW) WRENCH BOSS GAS INLET Figure 9. Gas Valve Components 2. HEATER STARTUP WARNING: During heater startup ...
Page 11 - NOTE; C. Partially depress knob and rotate to the OFF; Figure 10. Lighting of Pilot Burner
PILOT BURNER LIGHT PILOT WITH MATCH AS SHOWN GAS VALVE DEPRESS TO LIGHT D. Wait 5 minutes to allow gas that may have accumulated in the main burner to escape(especially important after installation). E. Turn the manual gas control knob to the PILOT position. F. Depress the manual gas control knob. U...
Page 12 - ADJUSTING THE PILOT FLAME
CHAPTER IV OPERATOR MAINTENANCE INSTRUCTIONS 1. TROUBLESHOOTING A. Table 4 lists the common malfunctions which you may find during the operation or maintenance of your heater. B. For additional information, refer to Honeywell Field Bulletin enclosed in the heater carton. C. In the event results cann...
Page 13 - Table 4. Trouble Shooting Chart; SYMPTOMS; Intermittent use
Table 4. Trouble Shooting Chart Below in chart form are various symptoms of a malfunctioning system, possible defects that will cause these symptoms and suggested corrective measures. The chart assumes that the proper gas pressure is available to the heater and that the lighting procedure is as stat...
Page 14 - IF SERVICE IS REQUIRED; PLEASE DO NOT RETURN THIS APPLIANCE TO YOUR STORE; CHAPTER V
IF SERVICE IS REQUIRED PLEASE DO NOT RETURN THIS APPLIANCE TO YOUR STORE For information regarding service, please call our Toll-Free Number:1-800-251-0001. Our office hours are 8:30 AM – 5:00 PM, Eastern Time ZoneMonday through Friday Please include the model number, date of purchase, and descripti...
Page 15 - ALL WARRANTY CLAIMS REQUIRE PROOF OF PURCHASE
7 6 5 15 4 14 13 10 17 16 22 21 8 20 11 12 1 3 19 18 2 9 23 Table 5. Replacement Parts List for Heater Models MH/HS25NG and MH/HS25LP ITEM NO. STOCK NO. DESCRIPTION ITEM NO. STOCK NO. DESCRIPTION 1 02529A Burner Assembly Complete 12 05455 Orifice-Burner-Propane Gas 2 00377A Reflector Assembly 13 055...
Page 16 - WARRANTY INFORMATION; Keep this warranty
ANSI Z83.6b-1993 ENERCO GROUP, INC., 4560 W. 160TH ST., CLEVELAND, OHIO 44135216-916-3000 Toll Free Number 1-800-251-0001 www.mrheater.comMr. Heater is a registered trademark of Enerco Group, Inc. © 2005, Enerco/Mr. Heater. All rights reser ved WARRANTY INFORMATION Keep this warranty Model _________...
Page 17 - RENSEIGNEMENTS SUR LA GARANTIE
ANSI Z83.6b-1993 ENER CO GR OU P , INC., 4 560 W . 1 60TH ST ., CLEVEL AND, OHIO 441 3 5 2 16 91 6-3 00 0 Numéro sans fr ais 1 800 2 51-000 1 www.mrhea ter .com Mr. Hea ter est une marqu e déposée d’Enerco Gr oup, Inc. © Enerco/Mr . Heater , 2 00 5. T ous dr oits réservés. RENSEIGNEMENTS SUR LA GARA...
Page 19 - NE RETOURNEZ P; CHAPITRE V
SI UNE RÉP ARA TION EST NÉCESSAIRE NE RETOURNEZ P AS CET APP AREIL À VOTRE MAGASIN Pour plus de renseignements sur les réparations, veuillez appeler notre numéro sans frais : 1 800 251-0001. Nos heures d’ouverture sont de 8 h 30 à 17 h, HE, du lundi au vendredi Veuillez inclure le numéro de modèle, ...
Page 20 - Usage intermittent; Elle ne fonctionne pas correctement lors de
T ableau 4. T ableau de dép annage Le tableau suivant présente différents symptômes d’un système défectueux, les causes possibles de ces symptômes et les mesures correctives suggérées. Le tableau suppose que la pression du gaz combustible est appropriée et que la procédure d’allumage est conforme à ...
Page 21 - La flamme de la veilleuse doit envelopper 10 à
CHAPITRE IV DIRECTIVES D’ENTRETIEN À L’INTENTION DE L’UTILISA TEUR 1. DÉP ANNAGE A. Le tableau 4 énumère les défaillances courantes durant le fonctionnement ou l’entretien de votre radiateur . B. Pour plus de renseignements, consultez le bulletin technique Honeywell inclus dans la boîte du radiateur...
Page 22 - REMARQUE; TEUR
VEILLEUSE ALLUMER LA VEILLEUSE A VEC UNE ALLUMETTE TEL QU’INDIQUÉ SOUP APE DE GAZ ENFONCER POUR ALLUMER D. Attendez 5 minutes pour permettre la dissipation du gaz accumulé dans le brûleur principal (particulièrement important après l’installation). E. T ournez le bouton de commande manuelle de gaz à...
Page 23 - Figure 9. Composants de la soupape de gaz; DÉMARRAGE DU RADIA TEUR; Ouvrez le ou les robinets d’alimentation; CHAPITRE III; CONSIGNES DE SÉCURITÉ; FIGURE 8. COMMANDES DU
BOUTON DE COMMANDE DE GAZ MANUELLE BLOC D’ALIMENT ATION DU CAPTEUR DE VEILLEUSE RÉGLAGE DU RÉGULA TEUR DE PRESSION RÉGULA TEUR DE PRESSION ST ANDARD SORTIE DE GAZ DE VEILLEUSE (DÉRIV ATION DE PRESSION DIRECTEMENT EN DESSOUS) VIS DE RÉGLAGE DU DÉBIT DE LA VEILLEUSE (SOUS LA VIS DU COUVERCLE) BOSSAGE ...
Page 25 - Figure 4. Schéma de câblage
LAISSEZ 2 FILETS DÉNUDÉS UTILISEZ UNE QUANTITÉ MODÉRÉE DE PÂTE À JOINT TUY AU NOIR 1/2 PO V oir le Code national de l’électricité, NFP A70- 1993, et, pour les installations canadiennes, le Code canadien de l’électricité en vigueur , C22.1- 3. CONNEXION DU RADIA TEUR À L ’ALIMENT ATION EN G AZ A VERT...
Page 26 - Figure 3. Directives de montage du radiateur
B. Préparez-vous à installer le support mural du radiateur comme suit : 1. Si le support mural doit être fixé à un mur à poteaux de cloison et panneaux de revêtement, consultez la figure 3 pour les dimensions, repérez le poteau et percez des trous d’implantation de 3,2 mm (1/8 po) au centre du potea...
Page 29 - RENSEIGNEMENTS GÉNÉRAUX; V oir les t; T ableau
• Le chapitre 2 fournit les exigences et renseignements relatifs à l’inst allation du radiateur , par exemple : a) les distances minimales entre les composants du radiateur et les matières combustibles, b) les exigences relativement au montage du radiateur , c) les exigences en matière d’aération, d...
Page 32 - Installateur : Laissez ce guide avec l’appareil. Consommateur; LISEZ SOIGNEUSEMENT LES INSTRUC
RADIA TEUR D’A TELIER À INFRAROUGE ALIMENTÉ AU GAZ ENER CO GR OU P , INC., 4 560 W. 1 60 TH S T ., CLEVE LAND, OHIO 441 3 5 · 2 16 9 1 6- 3000 A VERTISSEMENT : Le non-respect des instructions, telles qu’indiquées dans le présent guide, peut causer une explosion ou un incendie entraînant des dommages...