Kohler K-T955-4-CP- Manuals

Kohler K-T955-4-CP– Installation Manual in PDF format online.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16

Summary

Page 3 - Install the Handles; Screw

1. Install the Handles NOTE: If the handle assembly does not reach the finished deck when it is fully tightened, replace the long stem extensions with theshort plastic extensions. Install a long stem extension onto each valve. Secure the stem extensions with the provided screws. Close the valves (ho...

Page 4 - Complete the Installation; Aerator

2. Complete the Installation Turn off the water (hot = clockwise, cold = counterclockwise). Remove the aerator assembly. Turn on the main water supply and check for leaks. Turn on the hot and cold valves and run water through the spoutto remove debris. Check for leaks. Turn off the hot and cold valv...

Page 5 - Guide d’installation; Garniture de valve montage sur comptoir; Outils et matériels; Clé à molette

Guide d’installation Garniture de valve montage sur comptoir Outils et matériels Merci d’avoir choisi la compagnie Kohler Nous apprécions votre engagement envers la qualité Kohler. Veuillezprendre s’il vous plaît quelques minutes pour lire ce manuel avant decommencer l’installation. Ne pas hésiter à...

Kohler Manuals