Kohler K-T14419-4-PGD- Manuals

Kohler K-T14419-4-PGD– Installation Manual in PDF format online.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20

Summary

Page 3 - Spout

1. Install the Spout IMPORTANT! Use care when installing the spout to avoid scratching the finish. Thread the spout into the spout shank until it is snug. If needed,adjust the spout slightly to position it so it points straight down. Secure the spout in place by tightening the flange with the screws...

Page 4 - Install the Handles; Escutcheon

2. Install the Handles NOTE: If the finished wall is less than 5/8 ″ (1.6 cm) thick, no spline adapter will be used with the installation. Determine the thickness of the finished wall. If the finished wall is less than 5/8 ″ (1.6 cm) thick, use the 1 ″ (2.5 cm) long stem extension, 7/8 ″ (2.2 cm) lo...

Page 6 - Complete the Installation

3. Complete the Installation Ensure that both faucet handles are turned off (hot =counterclockwise to close, cold = clockwise to close). Turn on the water supplies and check the installation for leaks. Repair as needed. Remove the aerator. Open the valves and run water through the spout for about am...

Kohler Manuals