Kohler K-994-4-CP- Manuals

Kohler K-994-4-CP– Installation Manual in PDF format online.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32

Summary

Page 4 - Max

1. Prepare the Site NOTICE: Adequate floor support is required. The wood support must be a minimum of 2 ″ (51 mm) thick by 6 ″ (152 mm) wide. 2x6 lumber is NOT adequate for this application. 26-3/8" (670 mm) Min 27-3/16" (691 mm) Max 5-13/16"(148 mm) 2" (51 mm) Min2-3/4" (70 mm) ...

Page 6 - Washer

3. Install the Base Locate the position on the wood support where the base will beinstalled. Use the base as a guide to mark the mounting holelocations. Drill 1-1/2 ″ (380 mm) deep holes with a 3/16 ″ drill bit (provided) using the marked locations as the center point. Secure the base to the support...

Page 7 - Connect the Supplies

4. Connect the Supplies Apply sealant tape on the ½ ″ NPT hot and cold supply pipes and thread into the base. NOTE: The base has a blue mark and a notch on the cold supply side. Insert the plug into the base. Turn on the main water supply and check for leaks. Turn off the main water supply. Secure t...

Kohler Manuals