Kohler K-9439-2BZ- Manuals

Kohler K-9439-2BZ– Installation Manual in PDF format online.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28

Summary

Page 2 - Shut off the main water supply.; Screwdrivers

Tools and Materials Before You Begin Shut off the main water supply. Observe all local plumbing and building codes. The trim design illustrated in this guide is representative andmay differ from the actual trim being installed. Install the trim asinstructed. Kohler Co. reserves the right to make rev...

Page 3 - Install the Valve Stem Adapter; For a standard wall -; and; Do not

1. Install the Valve Stem Adapter NOTE: Check the finished wall surface as related to the graphics on the plaster guard. Select the correct length valve stem adapter and valve stemadapter screw for your application. Refer to the informationstamped on the plaster guard to verify the wall thickness. F...

Page 4 - Adjust the Handle Assembly; To adjust for handle alignment:

2. Adjust the Handle Assembly Ensure the valve stem adapter is lightly placed over the splineadapter. Place the handle assembly over the valve stem adapter. Turn the handle assembly clockwise until the stop is contacted.The valve will be in the full cold position. The handle should bebetween the 9 a...

Kohler Manuals