Kohler K-10087-9-CP- Manuals

Kohler K-10087-9-CP– Installation Manual in PDF format online.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24

Summary

Page 2 - Follow the installation dimensions precisely.; Solder

Tools and Materials Before You Begin NOTICE: Follow the installation dimensions precisely. Observe all local plumbing and building codes. Shut off the main water supply. When planning the installation, ensure the spout location willconform to all local plumbing codes and national consensusstandards ...

Page 5 - Complete the Valve Installation; Do not

2. Complete the Valve Installation If you have not already done so, install supply stops. Install copper tubing between the valves and the supply stops. Temporarily pull the plaster guards from the handle shanks andspout shank. Do not discard them at this time. Position a bucket in front of the spou...

Page 6 - Install the Shank and Sleeves; Apply supplied lubricant to the O-rings on each end of the shank.

4. Install the Shank and Sleeves Apply supplied lubricant to the O-rings on each end of the shank. Using three screws (provided), secure the shank to the center ofthe unit. NOTE: Several hardware kits are provided. If the finished wall is 1/4 ″ (6 mm) to 5/8 ″ (1.6 cm) thick, select hardware kit 108...

Kohler Manuals