Page 3 - Installation; DO NOT TRANSPORT BREWER WITHOUT DRAINING WATER TANK FIRST.; WARNING
Page 2 P200/RAPS200 Brewers Installation (con't.) Electric hook-up 1) The electric ratings for your brewer are printed on its nameplate. Typical electric ratingsare: 120V, 1.65 kW, 15 Amp, 1 phase. 2) The brewer should be connected to its own circuit with a fused disconnect switch or a circuit break...
Page 4 - Operation; CAUTION: HOT LIQUID HAZARD
Page 3 Operation CAUTION: HOT LIQUID HAZARD WATER USED FOR BREWING COFFEE IS VERY HOT. USE CAUTIONWHEN BREWING, POURING, OR TRANSPORTING COFFEE. ACCIDENTALSPILLS MAY RESULT IN SEVERE BURNS. 1) Place an empty, warm Shuttle under the brew head. Turn on the warmer once a Shuttle is in place, or place a...
Page 5 - Adjustments; WARNING: ELECTRIC SHOCK HAZARD; Brew Volume Adjustment; Timer Adjustment
Page 4 Adjustments WARNING: ELECTRIC SHOCK HAZARD DANGEROUS ELECTRIC VOLTAGES ARE PRESENT NEAR ADJUSTABLECOMPONENTS. ALL ADJUSTMENTS SHOULD BE PERFORMED BYQUALIFIED SERVICE PERSONNEL ONLY. All adjustable components are located under the top cover. To access these parts: 1) Unplug the brewer. 2) Remo...
Page 6 - Thermostat Adjustment; Cleaning; WARNING: BURN HAZARD
Page 5 Thermostat Adjustment The thermostat controls the water temperature in the tank. Factory setting is 195 degrees F. Thisis the ideal temperature for brewing coffee. Water should never boil in the tank. If water is boiling in the tank, adjust the temperature appropriately. Standard Mechanical T...
Page 8 - Service
Page 7 P200/RAPS200 Brewers To Drain The Water Tank CAUTION: HOT LIQUIDS / BURN HAZARD WATER IN TANK IS VERY HOT. USE CAUTION WHEN DRAINING TANK. ACCIDENTAL SPILLS MAY RESULT IN SEVERE BURNS. 1) Shut off power to brewer. 2) Remove the top panel. 3) Remove the warmer shelf. 4) Pinch or clamp the tube...
Page 12 - Exploded View for the P200-E
Page 11 P200/RAPS200 Brewers Exploded View for the P200-E ITEM DESCRIPTION PART #
Page 13 - Exploded View for the P200 (G version only)
Page 12 P200/RAPS200 Brewers Exploded View for the P200 (G version only) ITEM DESCRIPTION PART #
Page 14 - Exploded View for the RAPS200-E
Page 13 P200/RAPS200 Brewers Exploded View for the RAPS200-E ITEM DESCRIPTION PART #
Page 15 - Exploded View for the RAPS200 (G version only)
Page 14 P200/RAPS200 Brewers Exploded View for the RAPS200 (G version only) ITEM DESCRIPTION PART #
Page 20 - WARRANTY; GENERAL WARRANTY INFORMATION; HOW TO OBTAIN WARRANTY SERVICES; Grindmaster CorporationTM
WARRANTY for P200/RAPS200 Series GENERAL WARRANTY INFORMATION Grindmaster maintains the highest standard of quality control in the manufacturing of American Metal Wareproducts. We use the finest components and materials, and employ quality engineering standards andtests. The P200E Brewer is warrante...