Page 2 - Page 2; Installation, Operation & Maintenance Manual; CONTENTS; FOR QUICK START, SEE SECTION 5 ON PAGE 20; Page
Page 2 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 CONTENTS FOR QUICK START, SEE SECTION 5 ON PAGE 20 THIS MANUAL COVERS MSL600 FROM SOFTWARE VERSION 3.00 AND ABOVE Page (i) Safety precautions 1. Introduction ..................................................
Page 4 - Page 4; Figures and tables
Page 4 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 7.8.4 Low Mem Alarm - P593 ....................................................................................................................................... 36 7.9 Engineering parameters ...............
Page 5 - precautions
Page 5 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 (i) Safety precautions BEFORE OPERATING THIS DEVICE THE MANUAL SHOULD BE READ FULLY The following safety precautions should be observed before using this product or working on the attached cables. x This M...
Page 6 - Page 6
Page 6 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 1. Introduction Before operating this device the manual should be read carefully paying particular attention to the safety precautions laid out in section (i). This instruction manual provides comprehensiv...
Page 7 - air purge cleaning function; bracket
Page 7 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 Finally, sections 9 to 13 cover maintenance, troubleshooting, programming chart, technical specifications and dimension drawings relevant to using the MSL600 system. 1.3 Important MSL600 features The MSL60...
Page 8 - Page 8; Location
Page 8 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 1.4 As a system Figure (1) shows the architecture of the complete MSL600 system and where each component is intended to be used. Install the MSL603 transducer and mounting bracket on the rotating bridge or...
Page 9 - planning; clarifiers
Page 9 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 2. Application planning The following section discusses a few practical considerations when planning an installation. 2.1 Circular clarifiers Circular clarifiers are very common and can come with rotating ...
Page 10 - bridge
Page 10 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 2.1.2 Static bridge The transducer mounting arrangement is designed to lift out of the water if it is mounted on a fixed bridge when a moving scraper passes underneath (e.g. on a picket fence thickener). ...
Page 12 - Installing the bracket on the bridge
Page 12 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 With the bracket on the ground adjust the pivot tube up or down the main support tube until the distance between the angle bracket and midpoint of the transducer is dimension A. Adjust the clamping bracke...
Page 20 - start
Page 20 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 5. Quick start parameters The system leaves the factory with default values in all the parameters. These values, after installation, allow immediate operation without any further programming. However, it ...
Page 25 - operation; The menu structure; Main menu item
Page 25 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 6. Detailed operation The following sections go into programming the system in more detail. 6.1 The menu structure From the normal display, pressing the key will enter the menu system, see Figure (11). ...
Page 27 - Main menu parameters; parameters; Default Min Max Default Min Max; Default Min Max
Page 27 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 7. Application parameters The following section details each parameter. 7.1 Main menu parameters The following functions are available at the top level of the menu structure. Note: A full menu structure i...
Page 28 - Default Min Max
Page 28 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 7.2.4 Description – P240 This is a user defined alpha-numeric parameter. Any string up to 12 characters long may be entered using the keypad. This will usually be a description of the application. The fol...
Page 32 - RL1
Page 32 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 7.6 Relay parameters The following parameters are used to program the 2 available relays RL1 and RL2, which are controlled by the sludge blanket level. The mode of relay RL3 is fixed to fault indication. ...
Page 33 - mode
Page 33 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 7.6.1.2 Fault mode (relay RL1 and RL2 parameters P560 to P570) There are several fault conditions which can be assigned to a relay. Fault conditions may be selected to be signalled by relay, current, both...
Page 37 - Common algorithm parameters P621 to P629
Page 37 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 7.9 Engineering parameters The MSL600 blanket echo processing algorithm has been optimised for use on various types of municipal and industrial sludge. The user can select from either of two municipal slu...
Page 42 - Municipal 2 parameter P640; Default
Page 42 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 7.9.4 Municipal 2 parameter P640 Only one specific parameter, P640, needs to be adjusted when the Municipal 2 algorithm is selected. Industrial blankets are typically much denser and more substantial than...
Page 43 - CYCLE function; test
Page 43 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 7.10 System parameters These parameters can be used to test the MSL600 hardware. Note: A full menu structure is shown in section 11. 7.10.1 AUTO CYCLE function The Auto Cycle or Self-Test function has the...
Page 44 - Default = log download
Page 44 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 7.10.5 COMMS parameters P710 to P716 These parameters are used for serial RS232 communications. 7.10.5.1 Address - P710 Poll Address. The default value of this parameter should not be changed. The paramet...
Page 45 - Reference source not found.
Page 45 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 7.10.6.4 Date format - P734 The format for the date can be chosen from a list: x yy/mm/dd x dd/mm/yy (Default metric) x mm/dd/yy (Default imperial) 7.10.6.5 Keypad Sound - P735 Each time a key is pressed,...
Page 49 - reference; Transmit pulse and echo processing
Page 49 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 8. Technical reference 8.1 Transmit pulse and echo processing The transducer and it’s transmit and receive circuitry is optimized to work at 1.0MHz. Some sludge blankets are indistinct. The algorithm has ...
Page 50 - Programming chart
Page 50 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 11. Programming chart Main Menu Option Sub-menu Level 1 Sub-menu Level 2 Sub-menu Level 3 Parameter Title Par No. - - Go Offline ? - - INSTALLATION Tank Depth P101 Xdr Tilt Time P103 Tag No. P242 Descript...
Page 53 - Model
Page 53 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 12. Specification 12.1 MSL600 Model No. MSL600 Operating principle Ultrasonic sonar Range 7.0m (23 feet) Dead band 0.3m (1 foot) Accuracy +/-35mm (+/- 1.4”) Resolution 25mm (1”) Temperature limits oC - Se...
Page 54 - Weight
Page 54 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 Weight Enclosure & compressor housing 7.0 Kg / 15.4 lbs Transducer & mounting bracket 12.0 Kg / 26.4 lbs Approvals CE, LVD, EMC Max Altitude 2000m Max Humidity 95% RH Pollution Degree 2-1EC664 Add...
Page 55 - Dimensional drawings
Page 55 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 13. Dimensional drawings Figure (12): MSL600 Bridge mounted unit
Page 57 - MSL603 transducer cable extension; Fitting instructions:
Page 57 MSL600 Installation, Operation & Maintenance Manual IP262/Z0, Rev. AB February 2012 14. MSL603 transducer cable extension Parts required: ITT Cannon TNM connectors (Cannon part no.) [R.S. stock no.] 1 off Reversed receptacle (192993-0071) [265-9727] 1 off Reversed plug (192993-0051) [265...