January 2015 2 Quick Start Guide NOTICE This guide provides basic guidelines for the Emerson 1410 Smart Wireless Gateway. It does not provide instructions for diagnostics, maintenance, service, or troubleshooting. Refer to the Emerson Smart Wireless Gateway 1410 Reference Manual (document number 008...
Page 3 - Wireless Considerations; Power up sequence; General considerations; PC requirements
Quick Start Guide 3 January 2015 Wireless Considerations Power up sequence The Emerson Smart Wireless Gateway 1410 (Gateway) should be installed and functioning properly before Power Modules are installed in any wireless field devices. Wireless field devices should also be powered up in order of pro...
Page 4 - Step 1: Initial connection and configuration; Powering the gateway
January 2015 4 Quick Start Guide Step 1: Initial connection and configuration To configure the Emerson Smart Wireless Gateway 1410, a local connection between a PC/laptop and the Gateway needs to be established. The 1410 and the 1410D are operationally equivalent and the following instructions are a...
Page 5 - Establishing a connection; using an Ethernet cable.; Connections
Quick Start Guide 5 January 2015 Figure 2. 1410D Wiring Diagram A. 1410 Power and Serial ConnectionsB. Smart Wireless Field Link Power and Data Connections Establishing a connection 1. Connect the PC/laptop to the Ethernet 1 (Primary) receptacle on the Gateway using an Ethernet cable. 2. To establis...
Page 6 - b. Right click to select; Properties; button; OK; for both the; Note; a. Open a standard web browser; Use a proxy server
January 2015 6 Quick Start Guide b. Right click to select Properties . c. Select Internet Protocol (TCP/IP) , then select the Properties button. Note If the PC/laptop is from another network, record the current IP address and other settings so the PC/laptop can be returned to the original network af...
Page 7 - Configure the Emerson Smart Wireless Gateway 1410
Quick Start Guide 7 January 2015 Configure the Emerson Smart Wireless Gateway 1410 To complete initial configuration for the gateway:1. Access the default web page for the Gateway at https://192.168.1.10. a. Log on as Username: adminb. Type in password: default 00825-0200-4410_CB.fm Page 7 Monday, J...
Page 8 - System Settings>Gateway>Ethernet Communication to enter; a. Configure a static IP Address or set for DHCP and enter a Hostname; Disconnect the power and Ethernet cable from the Gateway.; Table 2. Network Settings
January 2015 8 Quick Start Guide 2. Navigate to System Settings>Gateway>Ethernet Communication to enter the Network Settings. a. Configure a static IP Address or set for DHCP and enter a Hostname . b. Restart application at System Settings>Gateway>Backup and Restore>Restart Apps . Not...
Page 9 - Step 2: Physical installation; Remote antenna; for the lightning arrestor, and for the antenna.
Quick Start Guide 9 January 2015 Step 2: Physical installation Remote antenna The remote antenna options provide flexibility for mounting the Gateway based on wireless connectivity, lightning protection, and current work practices. The remote mount antenna kit includes coaxial sealant for the cable ...
Page 10 - Figure 3. Installation of WL2/WN2 Option; Figure 4. Applying Coaxial Sealant to Cable Connections
January 2015 10 Quick Start Guide Figure 3. Installation of WL2/WN2 Option A. Remote AntennaB. CableC. Drip LoopD. Lightning ArrestorE. User Supplied Enclosure Containing GatewayF. GroundG. Earth Note: Weather proofing is required The remote mount antenna kit includes coaxial sealant for the cable c...
Page 11 - Connect to the host system; clean and secured to avoid wiring connection problems.
Quick Start Guide 11 January 2015 Note For installing the Smart Wireless Field Link, see reference document 00825-0100-4421. Connect to the host system 1. Wire the Gateway’s Ethernet 1 (Primary) or Serial Output connection to the Host System Network or Serial I/O. 2. For serial connections, connect ...
Page 12 - Best practice
January 2015 12 Quick Start Guide Figure 6. 1410D Housing Diagram A. DIN Rail clipB. Power and Reset indicator lights. During normal operation the power indicator will be green. During a reset the reset light will turn red. The reset switch should not be enabled during normal operation. C. Ethernet ...
Page 13 - such as virus scan software.; Install; from the menu when the AMS Wireless Configurator setup
Quick Start Guide 13 January 2015 Step 3: Software installation (optional) The 2 disk software pack contains the Security Setup Utility (only required for secure host connections or OPC communications) and AMS Wireless Configurator. The Security Setup Utility is located on Disk 1. To install the sof...
Page 14 - Step 4: Verify operations; Figure 7. Gateway Log In Screen
January 2015 14 Quick Start Guide Step 4: Verify operations Operation is verified through the web interface by opening a web browser from any PC on the host system network and entering the Gateway IP address or DHCP host name in the address bar. If the Gateway has been connected and configured prope...
Page 15 - Product Certification; The EC declaration of conformity can be found on; North America; FM Approvals, Nonincendive for Class I Division 2
Quick Start Guide 15 January 2015 Product Certification Approved Manufacturing Locations Rosemount Inc. - Chanhassen, Minnesota, USA Emerson Process Management Asia Pacific Private Limited - Singapore Telecommunication Compliance All wireless devices require certification to ensure they adhere to re...