Desa GA9150A - Manuals

Desa GA9150A – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12

Summary

Page 2 - INSTALLATION; Minimum; Inlet; CHECK GAS TYPE; Figure 1 - Technical Information Charts

www.desatech.com 901053-01J 2 INSTALLATION Btu/Hr Input Btu/Hr Input Minimum MODEL DESCRIPTION Natural Gas Propane Gas Vent Opening CVSR18 18" Single Burner 50,000 40,000 8" dia. CPVSR18 18" Single Burner 50,000 40,000 8" dia. CVSR24 24" Single Burner 60,000 50,000 8" dia. CP...

Page 3 - Installation Items Needed; Continued; Install equipment shutoff valve

www.desatech.com 3 901053-01J Installation Items Needed Before installing log set, make sure you have the items listed below.• piping (check local codes)• sealant (resistant to propane/LP gas)• equipment shutoff valve*• test gauge connection*• adjustable (crescent) wrench or pliers• sediment trap• t...

Page 4 - Figure 4 - Equipment Shutoff Valve; CHECKING GAS CONNECTIONS; Figure 3 - Gas Connection; Natural Gas

www.desatech.com 901053-01J 4 INSTALLATION Continued Figure 4 - Equipment Shutoff Valve Open Closed Equipment Shutoff Valve CHECKING GAS CONNECTIONS WARNING: Test all gas piping and connections, internal and external to unit, for leaks after installing or servicing. Correct all leaks at once. WARNIN...

Desa Manuals