Page 2 - TABLE OF CONTENTS; GENERAL DESCRIPTION
IMI CORNELIUS INC. 1996 TABLE OF CONTENTS GENERAL DESCRIPTION 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . UNIT DESCRIPTION 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....
Page 3 - UNIT DESCRIPTION; Width; Ambient Operating Temperature:; Minimum Flow Pressure; RECEIVING
1 630460001 GENERAL DESCRIPTION UNIT DESCRIPTION The Three-Flavor Tower is compact and may be island-mounted or installed on a front or rear counter. TheThree-Flavor Tower is designed to dispense three, portion controlled, noncarbonated drinks. One concentrateflavor is chilled by a heat exchanger. C...
Page 4 - CONCENTRATE SOURCE INSTALLATION
2 630460001 UNPACKING AND INSPECTION CAUTION: Unit must be lifted by the S/S tower to avoid damage. Do Not lift using valvehousings. Unpack a Unit as follows: 1. Open carton. 2. Lift Unit from carton. 3. Retain installation manual, and loose shipped parts. 4. Carefully inspect Unit for evidence of d...
Page 5 - Note: The inlet and outlet fittings on the Heat Exchanger are 1/2
3 630460001 COUNTERTOP HOLE LOCATION (TUBING ACCESS) 1. Using the template provided, layout the location of the access hole. 2. Cut the access hole in the counter. Be sure there are no sharp edges to damage the tubing. 3. Move the Unit into position over the hole and attach the tower to the counter....
Page 6 - Check all connections for leaks before insulating the tubing.; Python Insulation; CONNECT CONCENTRATE TUBING; Connect concentrate tubing to the Unit as follows:
4 630460001 7. Check all connections for leaks before insulating the tubing. Python Insulation Cold Carbonated WaterFrom Cooling Unit Cold Carbonated WaterReturn to Cooling Unit To HeatExchanger Inlet From HeatExchanger Outlet Syrup Tubing Oetiker Clamps (8) Tubing must be insulatedto prevent conden...
Page 10 - Figure 1; Remove the syrup/water separator by turning and pulling down.; SETTING THE PORTION CONTROL; then release the switch.
8 630460001 Figure 1 Cancel/PourSwitch LED IndicatorLight Note: Check local specifications for dispensed product water to syrup ratio specifications. G. If the ratios are correct, proceed to Step I. If the ratios are not correct, proceed to step H. H. Turn valve syrup flow control labeled “S4” (righ...
Page 11 - WARNING: Wear protective eyewear to avoid eye injury.; SANITIZING THE BAG-IN-BOX CONCENTRATE SYSTEMS; Place a waste container under the valve dispensing nozzle.
9 630460001 SANITIZING THE SYSTEM (USA) IMPORTANT: Only trained personnel should perform sanitizing procedures. WARNING: Wear protective eyewear to avoid eye injury. The syrup systems must be sanitized once every six months; whenever there is a flavor change, or an off flavoris noted in the product....
Page 12 - maximum of 100 degrees F.
10 630460001 15. Remove the tube-end connectors from the detergent. 16. Dispose of unused detergent in a sanitary sewer, not in a storm drain. Wash the container thoroughly. 17. Fill the 5-gallon container with potable (drinking) water. Place the tube-end connectors in the water. 18. Hold each dispe...
Page 13 - WARRANTY; IMI Cornelius Offices
11 630460001 WARRANTY IMI Cornelius Inc. warrants that all equipment and parts are free from defects in material and workmanship un-der normal use and service. For a copy of the warranty applicable to your Cornelius, Remcor or Wilshire prod-uct, in your country, please write, fax or telephone the IM...