Carrier 50PG03-07 - Manuals

Carrier 50PG03-07 – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22

Summary

Page 4 - INSTALLATION; Step 1 — Provide Unit Support; Roof Curb; IMPORTANT; Alternate Unit Support; Step 2 — Rig and Place Unit; PERSONAL INJURY AND PROPERTY DAMAGE HAZARD; Positioning; NOTE; NOTE; CAU O

4 INSTALLATION Step 1 — Provide Unit Support Roof Curb Assemble or install accessory roof curb in accordance withinstructions shipped with this accessory. (See Fig. 1.) Install insulation, cant strips, roofing, and counter flashing as shown. Ductwork can be installed to roof curb before unit is set ...

Page 5 - Table 1 – Physical Data

5 Table 1 – Physical Data BASE UNIT 50PG 03 04 05 06 07 NOMINAL CAPACITY (Tons) 2 3 4 5 6 OPERATING WEIGHT (lb) Unit* 704 704 775 829 874 Economizer Vertical 40 40 40 40 40 Horizontal 50 50 50 50 50 Humidi-MiZer ™ Adaptive Dehumidification System 22 22 31 27 26 Roof Curb 14-in. 122 122 122 122 122 2...

Page 7 - Step 3 — Field Fabricate Ductwork; Do not connect ductwork to unit; Step 4 — Make Unit Duct Connections; Vertical Supply/Return Configuration; PERSONAL INJURY HAZARD; WARNING; Horizontal Supply/Return Applications; Step 5 — Install External Trap for Condensate

7 Step 3 — Field Fabricate Ductwork On vertical units, secure all ducts to roof curb and buildingstructure. Do not connect ductwork to unit . For horizontal applications, field--supplied flanges should be attached to horizontal discharge openings and all ductwork secured to theflanges. Insulate and ...

Carrier Manuals