Page 2 - Supplemental General Conditions:; Supplemental General Conditions
Supplemental General Conditions: The Work under this Contract is subject to the provisions of the Davis-Bacon and Related Acts, as published in the U.S. Department of Labor regulations (29 CFR Parts 1, 3, and 5). The Contractor must comply with the minimum rates for wages for laborers and mechanics ...
Page 5 - General Specifications; Contractor must execute and sign
General Specifications 1) A pre-bid conference will be held on November 28, 2011 at 8:00 am at the Carroll County Public Library. While the pre-bid is not mandatory, it is strongly suggested that all potential contractors be in attendance. 2) All contractors must provide a copy of worker’s compensat...
Page 8 - All new trim moldings must match current molding design.
Window Replacement/Exterior Moldings Specifications (Base Bid Item) 1) Contractor shall bid to remove all windows and exterior moldings and dispose of properly. 2) Contractor is responsible for his/hers own measurements and calculations. 3) Contractor shall furnish all tools, material, and labor, to...
Page 10 - Tile Specifications – Material Only (Additive Bid Item); County will pick colors of tile to be used.
Tile Specifications – Material Only (Additive Bid Item) 1) All Contractors interested in bidding on floor/wall tile are responsible for sending out their own representative for all measurements and calculations. 2) Contractor shall bid 12x12 porcelain tiles for both wall and floors. 3) County will p...
Page 11 - Paint Supply Specifications – Materials Only (Additive Bid Item); Contractors must bid a company’s top grade paint.
Paint Supply Specifications – Materials Only (Additive Bid Item) 1) Contractors must bid a company’s top grade paint. 2) County will pick the two colors of paint to be used. 3) Contractors shall include product name brands, warranties and specifications along with their bid. 4) Contractor shall bid ...
Page 12 - Porch Columns Specifications – Material Only (Additive Bid Item)
Porch Columns Specifications – Material Only (Additive Bid Item) 1) All Contractors interested in quoting porch columns are responsible for sending out their own representative for all measurements and calculations. 2) Contractor shall quote (8) Polyclassic fluted non-tapered fiberglass 10” diameter...
Page 16 - Landscaping Specifications (Additive Bid Item)
Landscaping Specifications (Additive Bid Item) 1) Bid is for the removal of (9) Bradford pear trees. 2) Contractor is responsible for any permits, utility approvals and locations needed to complete job. 3) Contractor shall take down and haul away all tree debris; grind a total of (10) stumps 6” belo...
Page 17 - Vinyl Fence Specifications – Material Only (Additive Bid Item); Contractor shall bid the following:
Vinyl Fence Specifications – Material Only (Additive Bid Item) 1) All Contractors interested in quoting Vinyl Fencing are responsible for sending out their own representative for all measurements and calculations. 2) Contractor shall include in quote all post caps, mounting hardware, hinges, latches...