Page 2 - LOCATE UNIT
2 CONTENTS Page GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 UNIT INSPECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-5 LOCATE UNIT. . ...
Page 3 - FIGURE 1 — MIRACOOLTM BOTTLE COOLER UNIT COMPONENTS (Size 750L Shown)
3 LEVELING FOOT SHELF PRODUCT CHAMBER FRONT GRILLE INTERNAL FLUORESCENT LAMP —SIZE 750L(SIZE 260L, 3 00L — ALONG TOP; SIZE 1100L, 1 3 00L — IN CENTER) UNIT DATA LABEL(INSIDE COOLER IN UPPERLEFT CORNER) FLUORESCENT LAMP SIGNBOARD(SIZES 750L, 1100L, AND 1 3 00L ONLY) WOOD SKID RETAINING SCREW,IF USED ...
Page 4 - LEVEL UNIT
4 LEVEL UNIT To provide adequate condensate drainage and proper door alignment and operation of unit, the unit cabinet must be level. Leveling feet are factory installed. Remove refrigeration system cartridge for easier access to back feet. TO REMOVE CARTRIDGE 1. After disconnecting the unit from ...
Page 5 - INSTALL SHELVES; TO INSTALL SHELVES; CONDENSATE DISPOSAL; FIGURE 5 — SHELF CLIP INSTALLATION
5 INSTALL SHELVES Product shelves and a bag containing shelf support clips are packed inside the unit. Refer to Table 1 to verify quantity of shelves and shelf supporting clips. Bottom shelf must be placed on interior floor and should be inserted into the two retainer clips provided at the rear corn...
Page 6 - PRELIMINARY CHECKS; VERIFICATION; FIGURE 7 — CHECK INSTALLATION OF LAMP WITHOUT SAFETY SHIELD
6 START-UP PRELIMINARY CHECKS BI-PIN FLUORESCENT LAMP INSTALLATION/ VERIFICATION — Before applying power to the unit, verify that all lamps have been properly installed and are fully engaged in the lamp holders. Sizes 750L, 1100L, and 1300L have 2 lamps, one in the signboard and one inside the coo...
Page 8 - COMPONENTS; CONDENSER; SERVICE AND TROUBLESHOOTING; CARTRIDGE REMOVAL
8 REFRIGERATION SYSTEM SERVICE COMPONENTS The Carrier Miracool™ refrigeration system consists of a hermetically sealed compressor and finned evapo- rator and condenser coils. CONDENSER — The condenser has wide finned spaces, which allow more air passage with less dirt or dust accumulation. The con...
Page 10 - TABLE 3 — REFRIGERATION SYSTEM SERVICE AND ANALYSIS CHART
10 TABLE 3 — REFRIGERATION SYSTEM SERVICE AND ANALYSIS CHART (Refer to Figures 10-12 for wiring diagrams) NOTE: All servicing must comply with state and federal regulations. MALFUNCTION POSSIBLE CAUSE SOLUTION Compressor Will Not Start —No Hum. 1. Line cord not plugged in. 1. Plug in the cord. 2. Po...
Page 12 - FIGURE 11 — WIRING DIAGRAM, SIZE 750L
Page 14 - MAINTENANCE; LAMP REPLACEMENT
14 MAINTENANCE LAMP REPLACEMENT Remove lamp by rotating lamp 90 degrees to align lamp pins with holder slots. Refer to Bi-Pin Fluores- cent lamp Installation/Verification section on page 6. CONDENSATE REMOVAL The evaporator drain pan is located in the base of the cartridge. In general, the condensat...
Page 15 - TABLE 4 — METHODS FOR CLEANING STAINLESS STEEL
15 TABLE 4 — METHODS FOR CLEANING STAINLESS STEEL *Use of brand names is intended only to indicate a type of cleaner and does not constitute an endorsement; nor does the omission of anybrand name cleaner imply its inadequacy. Many products named areregional in distribution and can be found in local ...