Page 2 - TABLE OF CONTENTS
This manual is an integral and essential part of the product. It should be kept with theappliance so that it can be consulted by the user and our authorised personnel. Please carefully read the instructionsand notices about the unit contained inthis manual, as they provide importanti n f o r m a t i...
Page 4 - INSTALLATION
4 The technical information and instructions provided herein below are intended for theinstaller so that the unit may be installed correctly and safely. The installation and initial star t up of the boiler must be by a CORGI RegisteredInstaller in compliance with the installation standards currently...
Page 7 - removed once the system has been filled.; ESIDUAL
7 C ENTRAL H EATING Detailed recommendations are given in BS 6798:1987 and BS 5449-1:1990, thefollowing notes are given for general guidance.P IPE W ORK : Copper tubing to BS EN 1057:1996 is recommended for water pipes. Jointing shouldbe either with capillary soldered or compression fittings.Where p...
Page 9 - illustrate some of; OAXIAL
Ø 80 mm In addition, it is also possible to use a split (twin pipe) system byfitting a special adaptor to the flue connector and using theaper ture for the air vent intake located on the top par t of thecombustion chamber.To utilise the air intake it is necessary to:1. Remove the bottom of the air i...
Page 10 - WIN; In calculating the lengths of the pipes, the
L = Sum of the total length of exhaust + air intake piping. 10 Exhaust Type C12 (xx)C32 (xx)C42 (xx) Restrictor ø 41 mm L min = 0.5 m L max = 1 m Maximum Extension Exhaust/Air L = 5 m Risk of Condensation Forming Coaxial Systems ø 60/100 Piping not insulated ø 41 restrictor NO restrictor NONE NONE P...
Page 12 - AS AND
12 1 2 3 4 567 89 10 11 12 13 14 15 16 17 L EGEND : 1. Fan 2. Main heat exchanger 3. Overheat thermostat 4. Burner 5. Ignition electrodes 6. Detection electrode 7. Regulation thermostat 8. Frost thermostat 9. Gas valve 10. Pump pressure switch11. Safety valve (3 bar)12. Boiler drain valve13. Automat...
Page 13 - selection of ARISTON unvented cylinders).; port valve installation
13 3. D.H.W. STORAGECYLINDER The microSYSTEM can be connected to a storage cylinder (both open-vented andunvented) for the production of domestic hot water (D.H.W.). Cylinders of differentcapacities can be used depending on site requirements (see T A B L E 3.1 for a selection of ARISTON unvented cyl...
Page 15 - COMMISSIONING; Boiler microSYSTEM
15 MTS (GB) Limited support the initiative. Within the information pack you willfind a copy of the logbook. It is impor tant that this is completed in thepresence of your customer, they are shown how to use it, and it is signed by them.Please instruct your customer that they must have their logbook ...
Page 16 - - Central Heating button
B 4 5 In order to access the inside of the boiler, it is necessar y tounscrew the fastening screws “A” of the control panel located onthe lower part of the panel itself.The control panel moves downward and when pulled forwardrotates on two lateral hinges.The panel stays in a semi-hor izontal positio...
Page 17 - P of operation of the air
17 The flue connector has two apertures, readings can be taken fort h e t e m p e ra t u r e o f t h e c o m bu s t i o n by - p r o d u c t s a n d o f t h ecombustion air, as well as of the concentrations of O 2 and CO 2 , etc. .To access these intakes it is necessar y to unscrew the frontscrew an...
Page 18 - Attach a hose pipe and open the drain valve; RAINING THE
The boiler is fitted with the following devices (see section 4.2 for references). 1 - I GNITION F AILURE : This indicates ignition failure when a flame is not detected within 7 seconds ofstar ting an ignition sequence. The L.E.D. “F” will illuminate to signal theshutdown status.The system can be res...
Page 19 - MAINTENANCE; GAS ADJUSTMENTS; Methane Gas
It is recommended that the following inspections be carried out on the boiler atleast once a year: 1 - Check the seals for the water connections; replace any faulty seals. 2 - Check the gas seals; replace any faulty gas seals. 3 - Visual check of the entire unit.4 - Visual check of the combustion pr...
Page 20 - Merloni TermoSanitari SpA - Italy; bief; TECHNICAL INFORMATION
Manufacturer: Merloni TermoSanitari SpA - Italy Commercial subsidiary: MTS (GB) LIMITED MTS BuildingHughenden AvenueHigh WycombeBucks HP13 5FT Telephone: (01494) 755600 Fax: (01494) 459775 Internet: http://www.mtsgb.ltd.uk E-mail: [email protected] Technical Service Hot Line: (01494) 539579 23 99 84...