Page 2 - TABLE 1: GAS AND ELECTRICAL CHARACTERISTICS
2 ROUGH-IN DIMENSIONS Figure 1. IMPORTANT! Refer to "Installation Clearances" section of manual(page 7) for recommended service clearances priorto boiler placement. TOP VIEW LEFT SIDE TABLE 2. ROUGH - IN DIMENSIONS A B C D E F M o d e l I n c h e s c m I n c h e s c m I n c h e s c m I n c h...
Page 4 - FOREWORD; GROUNDING INSTRUCTIONS
4 PRECAUTIONS IF THE UNIT IS EXPOSED TO THE FOLLOWING, DO NOTOPERATE UNTIL ALL CORRECTIVE STEPS HAVE BEEN MADEBY A QUALIFIED SERVICEMAN: 1. EXPOSURE TO FIRE.2. IF DAMAGED.3. FIRING WITHOUT WATER.4. SOOTING. IF THE BOILER HAS BEEN EXPOSED TO FLOODING, IT MUST BEREPLACED. LIQUID PETROLEUM MODELS Boile...
Page 5 - Consult the; CAUTION; An adjustable automatic reset limit control, that can be set to; FOR HOT WATER HEATING SYSTEMS (GB models); Due; to the; many various types of systems and operating conditions, a tank; SW1 OFF
5 Example: A Genesis boiler is rated at 1,300,000 Btu/hr. input at sealevel. At an altitude of 5,000 (1500m), the prejet orifices will decreasethe input rate by 20% (= 4% x 5) to a new rating of 1,040,000 Btu/hr.(= 80% x 1,300,000 Btu/hr.) The input reduction is achieved by theprejet orifices throug...
Page 6 - Do not operate this boiler using the internal high; CIRCULATING PUMP; , the circulator is NOT provided and; SAFETY RELIEF VALVES; INSTALLATION INSTRUCTIONS; REQUIRED ABILITY
6 probe is not supplied with the GB models. A tank probe can beused as an option to control loop temperature and unit staging.Additionally, the Inlet Temperature Probe can be used as the loopthermostat in some heating (GB) applications. These types ofcontrols connect to designated wires in the junct...
Page 7 - WARNING; Observing proper clearances will allow service; LEVELLING; FOR SAFE OPERATION, AN AMPLE SUPPLY OF AIR MUST BE
7 • THE BOILER MUST NOT BE INSTALLED ON CARPETING. • THE BOILER SHOULD NOT BE LOCATED IN AN AREA WHEREIT WILL BE SUBJECT TO FREEZING. • THE BOILER SHOULD BE LOCATED NEAR A FLOOR DRAIN. • THE BOILER SHOULD BE LOCATED IN AN AREA WHERELEAKAGE FROM THE BOILER OR CONNECTIONS WILL NOTRESULT IN DAMAGE TO T...
Page 8 - Where an exhaust fan is installed in the same room with a boiler,; VENTING; TABLE 6: DIRECT VENT KITS; CONNECTING BOILER TO A COMMON VENT
8 PROVIDED FOR PROPER COMBUSTION AND VENTILATION INACCORDANCE WITH THE NATIONAL FUEL GAS CODE, ANSIZ223.1 OR CAN/CSA-B149.1 AND .2 (LATEST EDITIONS) ORAPPLICABLE PROVISIONS OF THE LOCAL BUILDING CODES.AN INSUFFICIENT SUPPLY OF AIR MAY RESULT IN A YELLOW,LUMINOUS BURNER FLAME, CARBONING OR SOOTING OF...
Page 9 - Figure 4. Vent Termination Installation Clearances
9 1. Seal any unused opening in the common venting system.2. Visually inspect the venting system for proper size and horizontal pitch and determine there is no blockage or restriction, leakage,corrosion or other unsafe condition. 3. I s o l a t e t h e s p a c e c o n t a i n i n g t h e a p p l i a...
Page 10 - VENT PRESSURE MUST BE MAINTAINED
10 STANDARD VENT - VERTICAL (CATEGORY I) IMPORTANT! VENT PRESSURE MUST BE MAINTAINED BETWEEN -0.02" W.C. AND -0.04" W.C. AT 24" (61.0 cm) ABOVE BOILER COLLAR. • Connection for the appliance exhaust vent to the stack must be as direct as possible. Maximum and minimum venting lengthfor Cat...
Page 13 - safety and health of inhabitants.
13 DIRECT VENT - HORIZONTAL (CATEGORY III) WARNING: No substitutions of flue pipe or vent cap material are allowed. Such substitutions would jeopardize the safety and health of inhabitants. • A maximum of two elbows can be used on inlet and outlet vent piping respectively. Each elbow is equal to 10 ...
Page 14 - DIRECT VENT VERTICAL AND HORIZONTAL VENTING; HORIZONTAL VENT INSTALLATION; To change the unit to rear exhaust:; Figure 9. Switching from Vertical to Horizontal Venting
14 STANDARD (VERTICAL) VENTING, CATEGORY I THIS BOILER MAY BE VENTED ACCORDING TO TABLE 7 (ALSOSEE FIGURE 5). AT LEAST TYPE B VENTING MUST BE USEDWITH THE STANDARD VENTING OPTION (thru-the-roof) USINGTHE NATIONAL FUEL GAS CODE VENT TABLES.* TYPE B VENTP I P E C A N N O T B E U S E D I F T H E B O I ...
Page 15 - Table 12: INSTALLATION ITEMS
15 CONVENTIONAL SPACE HEATING INSTALLATION Modern fin type boilers are exceptionally fast heating units. The lowwater volumes in relation to firing rates require special attention tow a t e r f l o w r a t e s f o r s m o o t h , e f f i c i e n t o p e r a t i o n . T h e s econsiderations for the ...
Page 16 - Figure 10. Single or Multiple Boiler Installation Diagram; COOLING PIPING; Wiring should always
16 Figure 10. Single or Multiple Boiler Installation Diagram The circuits should be spaced on the header at a minimum of3" (7.6 cm) center to center. Install a balancing cock in each returnline. Manifold headers are recommended for split systems with orw i t h o u t z o n e v a l v e s a n d a l...
Page 17 - INTERNAL CONTAMINANTS; HOT WATER SUPPLY BOILER; WATER LINE CONNECTIONS
17 mandatory but offers smooth, efficient operation of a modernsystem. Normal use of flow control valves is required to prevent crosscirculation of zones as with any multiple pump system. Large systems with multiple boilers should include main watertemperature controls (with or without outdoor reset...
Page 18 - ONE GENESIS (MODEL GW) HOT WATER SUPPLY BOILER WITH HORIZONTAL TANK; DANGER; Figure 11. Single boiler with horizontal tank.
18 ONE GENESIS (MODEL GW) HOT WATER SUPPLY BOILER WITH HORIZONTAL TANK Figure 12. Tank probe installation. PRESSURE RELIEF VALVE RATING SHOULDNOT EXCEED PRESSURE CAPACITY OF ANYCOMPONENT IN THE SYSTEM. PIPING SHOULD CONFORM TO LOCAL CODES. BALL VALVES ARE SHOWN FOR SERVICINGB O I L E R . H O W E V E...
Page 19 - ONE GENESIS (MODEL GW) HOT WATER SUPPLY BOILER WITH VERTICAL TANK; Figure 13. Single boiler with vertical tank.
19 ONE GENESIS (MODEL GW) HOT WATER SUPPLY BOILER WITH VERTICAL TANK Figure 13. Single boiler with vertical tank. PRESSURE RELIEF VALVE RATING SHOULD NOT EXCEED PRESSURE CAPACITY OF ANY COMPONENT IN THE SYSTEM. PIPING SHOULD CONFORM TO LOCAL CODES. BALL VALVES ARE SHOWN FOR SERVICING BOILER. HOWEVER...
Page 20 - able 14. Suggested Pipe Size For Multiple Gas
20 T able 13. Suggested Pipe Size For Multiple Gas Appliances (Natural) T able 14. Suggested Pipe Size For Multiple Gas Appliances (Prop ane Gas) Length of Pipe in Feet (Metres) Maximum Cap acity of Pipe in BTU/hr and kW for Gas Pressures of 14 in. W .C. (0.5 p si) or Less and a Pressure Drop of 0.5...
Page 21 - Fittings and unions in the gas line must be metal to metal type.
21 GAS CONNECTIONS WARNING THIS BOILER IS NOT INTENDED TO OPERATE AT GAS SUPPLYPRESSURE OTHER THAN SHOWN ON THE RATING PLATE.EXPOSURE TO HIGHER GAS SUPPLY PRESSURE MAY CAUSEDAMAGE TO GAS VALVES WHICH CAN RESULT IN FIRE OREXPLOSION. IF OVERPRESSURE HAS OCCURRED SUCH ASTHROUGH IMPROPER TESTING OF GAS ...
Page 22 - WIRING CONNECTIONS; OPERATION; GENERAL; FILLING AND PURGING FOR HEATING
22 WIRING CONNECTIONS ALL ELECTRICAL WORK MUST BE INSTALLED IN ACCORDANCE W I T H T H E M O S T R E C E N T V E R S I O N O F T H E N AT I O N A L ELECTRICAL CODE/CANADIAN ELECTRICAL CODE AND MUST CONFORM TO LOCAL REGULATIONS. AN ELECTRICAL GROUND IS REQUIRED TO REDUCE RISK OF ELECTRIC SHOCK OR POSS...
Page 23 - If; MANIFOLD PRESSURE; Nearly instantaneous
23 PURGING OF GAS LINE Gas line purging is required with new piping or systems in whichair has entered. CAUTION P U R G I N G S H O U L D B E P E R F O R M E D B Y P E R S O N SEXPERIENCED IN THIS TYPE OF GAS SERVICE TO AVOID RISKOF FIRE OR EXPLOSION. PURGE DISCHARGE MUST NOTENTER CONFINED AREAS OR ...
Page 24 - Lighting Instructions for the G(B/W) 1000 through 2500 models; FOR YOUR SAFETY READ BEFORE OPERATING
24 Lighting Instructions for the G(B/W) 1000 through 2500 models A. THIS APPLIANCE DOES NOT HAVE A PILOT. IT IS E Q U I P P E D W I T H A N I G N I T I O N D E V I C E W H I C HAUTOMATICALLY LIGHTS THE BURNER. DO NOT TRY TOLIGHT THE BURNER BY HAND. B. BEFORE LIGHTING: SMELL ALL AROUND THE APPLIANCE ...
Page 26 - CONTROL SYSTEM; DESCRIPTION OF MULTI-STAGE FIRING SYSTEM; DIA-SCAN II DISPLAY BOARD OPERATING PROCEDURES; DIP SWITCH CONFIGURATION TABLE
26 CONTROL SYSTEM DESCRIPTION OF MULTI-STAGE FIRING SYSTEM The Central Control Board (CCB) is responsible for staging theIgnition Control Boards (ICB) and monitoring safety limit devices,control of circulation pump, power vent, alarm output and IRI gasvalves (only on IRI models). The thermostat also...
Page 30 - Procedure for Setting Pump Delay; The Controller is factory set with a 45 second post; Last Error Mode; All stages will remain running until the set point for a given
30 Procedure for Setting Pump Delay The Controller is factory set with a 45 second post circulate function. With the Display Board, the user has the capability to choosebetween a 45, 90, or 180 second post circulate time period, or turnthe pump on continuously. This provides flexibility in selecting...
Page 31 - PREVENTATIVE MAINTENANCE; MAIN BURNERS; Figure 17. Normal Flame Characteristics
31 drop out first followed by stages three, two and one. To achievemaximum efficiency, stages will reignite if the system watertemperature drops below the stage Set Point minus the SetPoint Differential. Note: Once a stage is satisfied, the blower associated with thatstage will allow a 25 second pos...
Page 32 - Allow boiler parts to cool before disassembly.; F (3°C) in the normal temperature rise through the
32 with this boiler should receive periodic (every six months) inspectionto assure proper operation. A low water cutoff device of the floattype should be flushed every six months. Periodic checks, at leasttwice a year, should be made for water and/or gas leaks. More frequent inspections may be neces...
Page 33 - TROUBLESHOOTING; LED
33 CAUTION IF HEAT EXCHANGER MAINTENANCE REQUIRES TUBINGREPLACEMENT, SPECIAL PROVISIONS SHALL BE TAKEN TOE N S U R E T H AT T H E D A M A G E D T U B E S A R E C A R E F U L LYREMOVED. REPLACEMENT TUBES MUST BE PROPERLY INSTALLED ANDEXPANDED INTO THE ROLLED TUBE TUB. OVER-ROLLING, MISALIGNMENT OF TU...
Page 35 - NEW BOILER LIMITED WARRANTY
35 NEW BOILER LIMITED WARRANTY A. O. Smith Corporation, the warrantor, extends the following LIMITED WARRANTY to the owner of this hydronic boiler: 1. If within TEN years after initial installation of the boiler, the heat exchanger shall prove upon examination by the warrantor to be defective in mat...
Page 36 - REPLACEMENT PARTS
36 REPLACEMENT PARTS 5621 W. 115TH STREET, ALSIP, IL 60803 Phone: 800-433-2545 Fax: 800-433-2515 www.hotwater.com E-Mail: [email protected]