Page 2 - TO INSTALLATION AND COMMISSIONING.; OBLIGATION TO GIVE INSTRUCTIONS; SAFETY INSTRUCTIONS
2 THE SAFETY INSTRUCTIONS AND OPERATING MANUAL ARE TO BE CAREFULLY READ PRIOR TO INSTALLATION AND COMMISSIONING. OBLIGATION TO GIVE INSTRUCTIONS The following safety and operating instructions must be carefully read before assembly, installation and commissioning of Thyro-P by those persons working ...
Page 3 - CAUTION
3 MALOPERATION AND THE RESULTS With maloperation, it is possible that power, voltage or current levels which are higher than planned reach the Thyristor Power Controller or load. On principle, this can lead to the Power Controller or load being damaged. It is important that preset parameters are not...
Page 5 - TABLE OF CONTENTS
5 Safety instructions 2 Schedule of Illustrations and Tables 7 Safety Regulations 8 Remarks on the present operating instructions and Thyro-P 11 1. Introduction 13 1.1 General 13 1.2 Specific characteristics 13 1.3 Type designation 14 2. Functions 15 2.1 Overview of operating modes 15 2.2 Set point ...
Page 7 - SCHEDULE OF ILLUSTRATIONS AND TABLES
7 Fig. 1 Control characteristic for U control 17 Fig. 2 Total set point 17 Fig. 3 Switch-on fault bridging 20 Fig. 4 Absolute value monitoring 21 Fig. 5 Relative monitoring 21 Fig. 6 Local operating and display unit (LBA) 25 Fig. 7 Operation display 32 Fig. 8 Cabinet installation kit 34 Fig. 9 Examp...
Page 8 - IMPORTANT INSTRUCTIONS AND EXPLANATIONS; ACCIDENT PREVENTION RULES; QUALIFIED PERSONNEL; SAFETY REGULATIONS
8 IMPORTANT INSTRUCTIONS AND EXPLANATIONS Operation and maintenance according to regulation as well as observance of the listed safety regulations is required for protection of the staff and to preserve readiness to operate. Personnel installing/uninstalling the devices, commissioning them, operatin...
Page 9 - WORK OBSERVING SAFETY REGULATIONS; measures due to operation must be initiated.; INTENDED USE
9 WORK OBSERVING SAFETY REGULATIONS Before removing safety installations for performance of maintenance and repair work or other work, measures due to operation must be initiated. Work observing safety regulations also means to point out faulty behaviour to colleagues and to notify the offi ce or pe...
Page 11 - ABBREVIATIONS; WARRANTY; REMARKS ON THE PRESENT OPERATING INSTRUCTIONS AND THYRO-P
11 VALIDITY These operating instructions refer to latest technical specifi cation of Thyro-P at the time of publi- cation and are for information purposes only. Every effort has been taken to ensure the accuracy of this specifi cation, however, in order to maintain our technological lead and for pro...
Page 12 - SERVICE HOTLINE; Our service is available to you through the following hotline:; INTERNET; © Copyright AEG Power Solutions 2012. All rights reserved.
12 SERVICE HOTLINE Our service is available to you through the following hotline: AEG Power Solutions GmbH Emil-Siepmann-Straße 32 D-59581 Warstein Phone +49 (0) 2902 763-100 http://www.aegps.com [email protected] INTERNET Further information on our company or our products can be found on th...
Page 13 - SPECIFIC CHARACTERISTICS
13 For transport, assembly, installation, commissioning, operation and decommissioning, the safety instructions contained in these operating instructions must be applied in any case and made available to all persons handling this product. CAUTION It is important that preset parameters are not adjust...
Page 15 - OVERVIEW OF OPERATING MODES; MOSI operation for 1P and 3P
15 For optimum adjustment to different products and production processes as well as differently electrical loads, the most favorable operating and control modes may be set according to the following overview. 2.1 OVERVIEW OF OPERATING MODES This chapter gives an overview of the various, partly type-...
Page 16 - SET POINT CONTROL CHARACTERISTIC; Set point 1
16 Mains load optimization (ASM procedure) For systems in which several Power Controllers are employed in full wave switch mode TAKT, it is possible that individual Power Controllers are synchronized so that a regular mains load is achieved by defi ned switching of the individual Power Controller in...
Page 24 - ATTENTION
24 2.5.2 VENTILATOR MONITORING The separately ventilated Power Controllers (-...HF) are fi tted with thermal monitoring. The tempe- rature is measured on the heat sink. In case of a temperature overrange, a fault inducation is issued (Profi bus, LED OVERHEAT). ATTENTION Activating this monitoring fu...
Page 32 - PG
32 3.1.4 COPYING FUNCTION USING THE LBA It is possible to load the complete user-specific data record (parameters) of a Power Controller (for instance no. 1) into the memory of the LBA (RAM), store it in the LBA (EEPROM) and then copy it into another Power Controller (for instance no. 2): PLUG LBA I...
Page 34 - LBA SUBMENUS WITH PASSWORD PROTECTION; REMARK
34 3.1.9 LBA SUBMENUS WITH PASSWORD PROTECTION REMARK After password input, further parameters may be modifi ed. These are mainly adjusting parameters required for achieving power control specifi cations. The modifi cation of these parameters requires extended specialist knowledge (for instance by t...
Page 38 - POWER SUPPLY FOR THE CONTROL DEVICE A7; STRIP TERMINAL X1; POWER SUPPLY FOR THE VENTILATOR; EXTERNAL CONNECTIONS
38 This chapter describes external connections of the Thyro-P as well as all available terminal strips and signals as necessary. Shielded cables grounded on the Thyro-P side must be used for the con- nection of the control signals (setpoint inputs and analogue outputs). For the connections to RESET,...
Page 40 - TERMINALS FUNCTION; SET POINT VALUE INPUTS
40 4.6 QUIT The input acknowledge (Quit, X5.2.19) has a circuit identical with the input RESET. It must be short-circuited against ground (X5.1.14) so that any faults are acknowledged. The fault signalling relay is reset. The input must remain closed for at least 2 line periods to perform acknowledg...
Page 41 - CURRENT TRANSFORMER; VOLTAGE TRANSFORMER; LOAD VOLTAGE
41 4.10 CURRENT TRANSFORMER ATTENTION By standard, each power section of the Power Controller has a current transformer. When using external current transformers, for instance on the secondary side of a transformer, these must be connected to the terminals X7.1 and X7.2 and terminated using a burden...
Page 42 - OTHER CONNECTIONS AND TERMINAL STRIPS; BREAK CONTACT CLOSER
42 In case of the Power Controller type 2P, the voltage transformers output the voltages L1-L2 and L3-L1. To achieve a good resolution of the voltage measurement, 3 measuring ranges are provided. Selection of the ranges is performed by means of 4-pin bars, which have been set to the Power Controller...
Page 45 - COMPONENT MOUNTING DIAGRAM CONTROL DEVICE; FIG. 10 FILE COMPONENT MOUNTING DIAGRAM CONTROL DEVICE
45 V116V 1 1 6 V132V 1 3 2 V114V 1 1 4 C137C 1 3 7 X30X 3 0 X31X 3 1 X24X 2 4 X10X 1 0 V112V 1 1 2 X507X 5 0 7 V281 V281 V261 V261 V271 V271 K3K 3 K2K 2 K1K 1 X508X 5 0 8 G800G 8 0 0 X222 X222 X221 X221 X201 X201 X510 X510 X509 X509 H405H 4 0 5 H404H 4 0 4 H403H 4 0 3 H402H 4 0 2 H401H 4 0 1 H400H 4...
Page 48 - FIBRE OPTIC INTERFACE; SIGNAL CONVERTER RS 232 / FIBRE OPTIC
48 The connecting socket X10 of the Power Controller is allocated as follows (1:1 connection): ATTENTION The LBA receives its power supply (+5V) via pin 8 of the socket X10. It is imperative that this voltage is not short-circuited. Otherwise, damage to Thyro-P may be incurred. If a PC is connected ...
Page 49 - to the plug-in power supply; FIG. 14 SIGNAL CONVERTER RS 232/FIBRE OPTIC
49 fibre optic transmitter (LLS) X30 fibre optic receiver (LLE) X31 to the plug-in power supply FIG. 14 SIGNAL CONVERTER RS 232/FIBRE OPTIC LLV.V The fi bre optic distributor supply LLV.V is the basic component for the fi bre optic system. It serves to connect star distributors and to amplify the li...
Page 50 - FIG. 15 SCHEMATIC DIAGRAM FIBRE OPTIC THYRO-P WITH LLV AND PC
50 The following fi gure shows the fi bre optic system with LLV, Thyro-P and PC. FIG. 15 SCHEMATIC DIAGRAM FIBRE OPTIC THYRO-P WITH LLV AND PC
Page 53 - X21 ASSIGNMENT
53 X21 ASSIGNMENT 1 PE (potential earthing) 2 ground M1 3 input 0/M1 4 input 1/M1 5 ground M24 / 24V supply for the Profi bus card 6 ground M2 7 input 2/M2 8 input 3/M2 / special function = Motorpoti enable 9 +24V / 24V supply for the Profi bus card * Loading: I X5.1.20 + I X5.2.20 + I X21.9 ≤ max. ...
Page 55 - FIG. 19 MODBUS SLOT CARD
55 5.3.2 MODBUS RTU With the Modbus interface component a connection is possible between Thyro-P and the wide- spread Modbus RTU. The slot card is inserted into the front of the control device and is ready for operation after parameterization. The control device must be supplied separately so that s...
Page 56 - SOFTWARE SYNCHRONIZATION; the base setting for the ASM process.; MAINS LOAD OPTIMIZATION
56 Mains load optimization (option) is possible in multiple controller applications. The application of mains load optimization offers substantial advantages: reduction of mains load peaks and mains reactions, smaller sizes (for instance for the transformer, feed and other installations) and associa...
Page 57 - control the place with the lowest mains load.; P o w e r; P o w e r; ASM input
57 When using the ASM option, the analog output 2 (X5.2.33 against ground X5.1.13) becomes an output proportionate to the current during the on-period T S . All Power Controllers connected to synchronization work on the same external burden. The burden resistor is calculated approximately as R burde...
Page 58 - CONNECTING DIAGRAMS
Page 63 - The thyristors are set to full scale; • Controller parameters Ti and Kp are set too small.
63 The thyristors are set to full scale • Was the set point set via motor potentiometer function? Check value using the LBA. • Check the control characteric (STA, STE, ADD). • Controller feedback signal available? Check current transformer and voltage transformer connections at the terminal blocks X...
Page 64 - * number of fuses per path of power section, built in
64 9.1 TYPE RANGE 400 VOLTS 9. TYPE OVERVIEW 508 TYPE VOLTAGE 230-400 VOLTS TYPE TYPE POWER DISSIPA- DIMENSIONS WEIGHT DIM. TEMP. CURRENT BURDEN SEMICON- CURRENT (KVA) TION (MM) (NET ABOUT DRAW. CHARACTE- TRANSF. RESISTOR DUCTOR FUSE* (A) 230V 400V (W) W H D KG) (NO.) RISTIC (NO.) T1 R40 ( Ω ) F1 (A...
Page 70 - DIMENSIONAL DRAWINGS; Dimensional Drawing 263
70 11. DIMENSIONAL DRAWINGS Dimensional Drawing 263 M 1:5 Thyro-P 1P (80 H, 130 H, 170 H) Thyro-P 1P (37 H, 75 H, 110 H) Dimensional Drawing 260 M 1:5
Page 76 - Dimensional Drawing 282
76 Thyro-P 2P (1850 HF, 2000 HF) 63 2.480 549 21.614 U1 U2 W2 W1 ø 0.354 for earthing Cu 3.149x0.393; ø 0.551 X10 X30X31 X2 X24 X5.2 X5.1 18.5 for 2P 690- 1850 HF 0.54x0.590 15 .591 365 14.370 395 15.551 91 3.583 X50 ø9 für Erdung X7 Cu 80x10; ø14 130 5.118 40 1.575 257 10.118 284 11.161 70 2.756 67...
Page 79 - Dimensional Drawing 290
79 X2 300 HF 495 HF 650 HF Thyro-P 3P (300 HF, 495 HF, 500 HF, 650 HF) Dimensional Drawing 290 M 1:6
Page 80 - Dimensional Drawing 292
80 Thyro-P 3P (780 HF, 1000 HF, 1400 HF, 1500 HF) 780 HF 1000 HF - 1500 HF Dimensional Drawing 292 M 1:9
Page 81 - Dimensional Drawing 294
81 Dimensional Drawing 294 18.5 for 3P 690-1700 HF Cu 3.149x0.393;ø0.551 Cu 80x10; ø14 225 8.858 70 2.756 925 36.417 1094 43.071 9x15 31 1.220 284 11.161 130 5.118 40 1.575 257 10.118 210 8.268 40 1.575 445 17.520 470 bei 3P 690-1700 HF 63 2.480 549 21.614 U1 U2 V2 V1 W2 W1 ø 0.354 for earthing X10 ...
Page 82 - Dimensional Drawing 295
82 Dimensional Drawing 295 M 1:9 Thyro-P 3P (2200 HF, 2600 HF)
Page 83 - DESCRIPTION; ACCESSORIES AND OPTIONS
83 ORDER NO. DESCRIPTION 2000000380 Thyro-Tool Familiy, commissioning and visualization tool for simple visualization tasks; software under Windows 95/NT4.0 and later 2000000393 Thyro-P interface card Profi bus-DP 2000000392 Thyro-P interface card Modbus RTU 2000000394 Thyro-P interface card DeviceN...
Page 84 - APPROVALS AND CONFORMITIES
84 Due to European harmonization and international reconciliation, the standards will be subject to years of adjustment and renumbering. The detailed schedule therefore contains the current stan- dards as well, even if the date for their expiry has already been set. There is no product norm for Thyr...