Avocent 120 - Manual

Avocent 120

Avocent 120 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
Page: / 2
Loading the manual

Switching your servers

Press the appropriate numbered front panel button to
access servers via your SwitchView SC switch.

Using the front panel card reader port

SwitchView SC 220 and 240 series switches are
equipped with a front panel USB card reader port to
support Common Access Card (CAC) functionality.
Front panel push-buttons allow you to switch KVM
sessions and the card reader together. A yellow LED
indicates the target device to which the KVM session
and card reader port is connected.

Mechanical

H x W x D = 1.72” x 10.36” x 5.68”
Weight = 2.3 lbs

The Power of Being There

®

Quick Installation Guide

SwitchView

®

SC Switch

For models: 120/140/220/240

The following will help you install your

SwitchView SC switch easily.

Should you require further assistance, please

contact Avocent Technical Support.

To install the SwitchView SC switch

To Contact Avocent Technical Support: Visit www.avocent.com

Avocent, the Avocent logo, The Power of Being There, the Cybex logo and SwitchView are registered trademarks of Avocent Corporation or its affiliates. ©2007 Avocent Corporation. All rights reserved.

590-718-501A

Connecting local peripherals

Turn off all servers that will be part of your
SwitchView SC switching system. Plug your
VGA monitor, keyboard and mouse cables into
the appropriate CONSOLE ports on the back
of your SwitchView SC switch.

Powering your system

Plug one end of the power cord into the
SwitchView SC switch power supply. Then,
plug the power supply into the SwitchView SC
switch. Next, plug the other end of the power cord
into an AC wall outlet. Turn on your switch first,
then all attached servers.

Connecting your servers

Using the SwitchView SC switch’s peripheral
cable set (USB or PS/2), plug the cables
into the corresponding ports on your server.
Plug the other end into any of the available server
ports on your SwitchView SC switch. Repeat
this process until all servers are

attached to the

SwitchView SC switch

. A green LED indicates

the target device is turned on.

1

2

4

Environmental

Operating Temperature: 32 ˚ (0˚C ) to 104˚ (40˚C )
Storage Temperature: 4˚ (-20˚C ) to 122 ˚ (50˚C )
Input Power: .8A; Operating Voltage 100-240 VAC
Power Frequency: 50-60 Hz

Supported hardware and specifications

S e r v e r s : I B M , S u n , P C / AT, U S B , P S / 2 a n d

100% compatibles

Video Modes: VGA, SVGA, XGA, SXGA, UXGA,

WVGA, WSVGA, WXGA, WSXGA, WUXGA,

and HDTV

Maximum Resolution: 2048 x 1536 @ 85Hz
Peripherals: USB and/or PS/2 keyboard and mouse

USB Common Access Card readers

3

3

2

5

SwitchView SC240

switch shown

1

4

5

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Other Avocent Models

All Avocent Other