Atlas Sound GSS-G - Manual

Atlas Sound GSS-G

Atlas Sound GSS-G – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
Page: / 2
Loading the manual

1/2

AtlasSound.com

TELEPHONE: (800) 876-3333

FAX (800) 765-3435

©20

10

Atlas S

ound L

.P.

All rights reserved.

Atlas S

ound is a trademark of

Atlas S

ound L

.P.

All other trademarks are the proper

ty of their respecti

ve owner

s.

All specs are subject to c

hange without notice.

ATS0

02960 R

evE 7/1

2

GSS-G & GST-G

Garden Speaker

1601 JACK MCKAY BLVD.

ENNIS, TEXAS 75119 U.S.A.

Key Features

Downward Firing Speaker Will Not Collect Dust or Condensation

Rugged Construction Can Support Up To 250 lbs

Easy Bayonet Attachment of Head Unit To Base, Enables Installation
of Base During Excavation and Installation of Head Unit After
Landscaping Has Been Completed

Switch Selectable 70V Input or Direct 8

Ω

Input (Transformer Bypass)

Easy Conduit Installation in Tall and Short Base With Dedicated
Mounting Pads

Speaker Protected By Triple Layer Grille

Short Base (GSS-G) has Drill Points for 4" Square, 2-Gang EO Box, or
1-Gang Box Mounting to a Deck or Slab

Instructions

To Install GST-B Tall Base Unit:

1. Make sure you have a path to bury wire connected to speaker.

2. Dig a hole 8" deep x 30" diameter.

3. Run wire to hole.

4. Attach conduit or gland nut to flats on base.

5. Bring in wire and leave sufficient cable for adequate service loop

(minimum 18") to reach head unit.

6. Fill base with clean dirt or sand to within 2"-3" of top for optimum

bass performance.

7. Cover with provided temporary lid and attach with provided

1" screws if head unit is not to be attached immediately.

8. Back fill dirt to base. Top of base should be 2" – 3" above ground.

To Install GSS-G Short Base Unit:

If Using an EO Box:

1. Install 1-Gang, 2-Gang, or 4" x 4" box flush to mounting surface.

2. Cut out scribed line on bottom of base for 1- or 2-gang box.

3. Drill appropriate holes in base (outer 4 holes for 4" x 4", inner 4 for

2-gang, or 1 set of 2 inner for 1-gang).

4. Install wiring in box.

5. Set base on box and attach with screws.

If Using Conduit:

1. Mount base to surface with appropriate screws through the base

bottom.

2. Attach conduit and bring in wire. Provide for surface loop

(minimum 18").

3. Cover with provided temporary lid and attach with provided 1" screws

if head unit is not to be attached immediately.

GST-G

Tall Base

GSS-G

Short Base

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Other Atlas Sound Models

All Atlas Sound Other