Assa Abloy Besam SW200I US - Repair Manual

Assa Abloy Besam SW200I US

Assa Abloy Besam SW200I US – Repair Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
51 Page 51
52 Page 52
53 Page 53
54 Page 54
55 Page 55
56 Page 56
57 Page 57
58 Page 58
59 Page 59
60 Page 60
61 Page 61
62 Page 62
63 Page 63
64 Page 64
65 Page 65
66 Page 66
67 Page 67
68 Page 68
69 Page 69
70 Page 70
71 Page 71
72 Page 72
73 Page 73
74 Page 74
75 Page 75
76 Page 76
77 Page 77
78 Page 78
79 Page 79
80 Page 80
81 Page 81
82 Page 82
Page: / 82

Table of Contents:

  • Page 4 – Following pages have been revised:; OPS added to the OPD sensors
  • Page 5 – pedestrian swinging or folding doors only.; Intended use; Do not climb on door parts.; Electronic equipment reception interference
  • Page 6 – Glazing materials; The glazing material for swing doors shall comply with ANSI Z97.1
  • Page 8 – Opening times
  • Page 10 – Control switch; Program; ON; Functions on the basic control unit CU-200; Also see page 52 for more information.; Power failure
  • Page 11 – Mat; Functions on the extension unit EXU-SI; KILL function
  • Page 12 – Function of locks; The control has an available output of DC for external locks; Panic bar
  • Page 13 – Functions on the extension unit EXU-SA; Also see page 56 for more information.; Monitored safety sensors
  • Page 14 – Single doors; Single operator, surface mounted; Pushing arm system shown. Other lengths are optional.; Double operator, surface mounted; Note: Consult Product Order form for availability; It is also possible to use two pushing or two pulling arm systems.
  • Page 15 – Concealed mounted; Operator for right handed door
  • Page 16 – Operator handing; Pull; Concealed; Push; Door handing
  • Page 17 – Surface mounted - Side loaded; Description
  • Page 18 – Arm systems; Pushing installation with PUSH-arm; Frame depth; High Performance
  • Page 19 – Pulling installation with PULL-arm
  • Page 20 – Pulling installation with PAS-arm
  • Page 21 – Double door installations; There are four different types of double door installations:
  • Page 22 – Nurse and bed functionality; Drive shaft extension kits
  • Page 23 – Push plates; Push plates; PUSH
  • Page 24 – Sync cable for double doors (synchronizing of 2 operators); Accessories; Surface mounting box; LED Cable
  • Page 25 – Labels; DO NOT; PULL TO; ACTIVATE
  • Page 27 – Types of installation; Surface Installation; to; General tips/Safety concerns; Make sure that the power is off before installing.
  • Page 28 – Installation examples
  • Page 29 – Fastening requirements; Minimum requirements of wall profile*; Tools required
  • Page 30 – Mechanical installation; Surface mounted installation; The door is controlled with a push or pull arm system.
  • Page 31 – PUSH arm system
  • Page 34 – Loosen all four screws.; See table Frame Depth on page 18 for available extensions.
  • Page 43 – III; IV
  • Page 46 – Operator with sliding PUSH arm system; For installation see PULL arm system on page 38.
  • Page 47 – Electrical connection; Note: The installation shall be made according to local codes.; Connection box, single door; Fit the connection box in the back plate as shown below.
  • Page 49 – Connection box, double doors; Rebuilding of Master Connection box into Slave Connection Box; a Remove the covers from both connection boxes.; Assemble Slave Connection box to Master Connection box
  • Page 50 – and connect the Interconnection cables to the control unit.
  • Page 51 – How to route the cables
  • Page 52 – Control units; CLSP; After changing MAT dip switch a new LEARN must be carried out.
  • Page 53 – Arm system selection; Spindle location (hinge to outgoing spindle)
  • Page 54 – Installation
  • Page 55 – Extension unit EXU-SI; Functions; Note: Lock only functions when Program Selector is in OFF or EXIT.
  • Page 56 – Extension unit EXU-SA
  • Page 57 – How to cut the jumper on the sync cable for double doors; Settings for double doors
  • Page 59 – Adjusting the door stop
  • Page 60 – SPTE
  • Page 61 – Note: Impulses are not accepted if SPTE is more than 0°.; Door stop arm
  • Page 62 – Auto-learn – automatically sets back and latch check (recommended); This learning is performed by pushing the LEARN BUTTON (LRN).
  • Page 63 – Double doors; General adjustment; a Set the hold open time with the potentiometer on the control unit.
  • Page 64 – Connection of activation units and accessories
  • Page 65 – Changing group of parameters; a Disconnect the electrical power contact.
  • Page 69 – Entering the program mode (classification); Classification
  • Page 70 – Cover; Creating slot in the cover for the drive shaft; center line of the output shaft.; Fitting and removing the cover
  • Page 71 – Troubleshooting; Remedies/Explanations
  • Page 72 – Error indication; Remedy
  • Page 73 – Maintenance plan; Abusive
  • Page 74 – REQUIREMENTS FOR POWER OPERATED DOORS; Swinging Doors; A single door swinging in or out, left-handed or right handed; General Requirements for Sensors
  • Page 76 – Entrapment Protection
  • Page 79 – Activation; The operator shall be activated by a knowing act.; Opening; Table I
  • Page 80 – Table II; Total Opening Time to 90 Degrees; Backcheck at 80 degrees; Table I plus 1second; Signage
Loading the manual
Page 1

Besam Swing Door Operator

SW200i US

Installation and Service Manual

Original instructions

1007718-US-3.0 – Issue 2012-06-27

ASSA ABLOY, the global leader in door opening solutions

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Was this manual helpful?

About this manual

Brand
Assa Abloy
Model
Besam SW200I US
Document type
Repair Manual
Language(s)
English
Pages
82
Format
PDF

Summary

Page 4 - Following pages have been revised:; OPS added to the OPD sensors

1 Revision Following pages have been revised: Revision 2.0 →3.0 Page OPS added to the OPD sensors 11, 52, 64 1007718-US-3.0 Issue 2012-06-27 4 1 Revision

Page 5 - pedestrian swinging or folding doors only.; Intended use; Do not climb on door parts.; Electronic equipment reception interference

2 Important information WARNING! Failure to observe the information in this manual may result in personal injury or damage to equipment. To reduce the risk of injury to persons - use this operator with single or double pedestrian swinging or folding doors only. Save these instructions for future ref...

Page 6 - Glazing materials; The glazing material for swing doors shall comply with ANSI Z97.1

The equipment may generate and use radio frequency energy and if not installed and usedproperly, it may cause interference to radio, television reception or other radio frequency typesystems. If other equipment does not fully comply with immunity requirements interference may occur.However, there is...

Ask a question

Up to 3 photos. Max 5 MB each. Formats: JPG, JPEG, PNG, WebP.