Ariston E-COMBI 24 30 38 - Manual

Ariston E-COMBI 24 30 38

Ariston E-COMBI 24 30 38 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
51 Page 51
52 Page 52
53 Page 53
54 Page 54
55 Page 55
56 Page 56
Page: / 56

Table of Contents:

  • Page 2 – INDEX
  • Page 3 – overview; Do not forget to complete the Benchmark Commisioning Checklist.; TECHNICAL DEPARTMENT
  • Page 4 – Advice for the installer
  • Page 5 – Safety regulations; Handle the appliance with suitable protection and with care.
  • Page 6 – product description; Control panel; button
  • Page 7 – electrode; Overall view
  • Page 8 – Overall Dimensions
  • Page 9 – Technical Data
  • Page 11 – installation
  • Page 12 – Flushing and Water Treatment; BS
  • Page 13 – Condensate Discharge
  • Page 14 – Connecting the boiler to the system
  • Page 15 – Safety Valve Discharge and Condense Outlet; Water connection; Connection for Filling Loop
  • Page 16 – Before the equipment is used, for the fi rst time the trap must
  • Page 17 – Water circuit diagram
  • Page 18 – Connecting the Flue; See; mm; Warning
  • Page 19 – Fitting the Coaxial Flue; Note: See table for maximum and minimum fl ue runs.; Installation without extension
  • Page 20 – Fitting the 5” Flue
  • Page 22 – - If you need to insert elbows in the air intake and exhaust
  • Page 23 – Table of fl ue gas exhaust duct lengths; Type; Type of air suction/fl ue gas exhaust ducting
  • Page 24 – Electrical connections; The appliance must be connected to an effi; Power supply cable; panel
  • Page 25 – Room Thermostat / Remote Clock Connection
  • Page 26 – Electrical diagram; Rd
  • Page 27 – commissioning; S Plan Wiring Diagram; Y plan system not suitable. See notes on page 25
  • Page 28 – Initial preparation
  • Page 29 – First ignition operation
  • Page 30 – irst ignition; Adjust the central heating ignition delay
  • Page 31 – Test function and combustion analysis; RESET; Minimum gas fl ow combustion analysis; value drops; Only a 4 key must be used; Gas setting
  • Page 32 – boiler protection devices; Boiler protection devices; Note
  • Page 33 – maintenance; Important; General comments; DO NOT MIX DIFFERENT TYPES OF ANTI-FREEZE.; Cleaning the primary exchanger; Combustion Analyses
  • Page 34 – maintenance guide; General access; Tools
  • Page 35 – Electrical unit
  • Page 37 – Hydraulic Unit; Right hand hydraulic block assembly
  • Page 38 – Unplug the diverter valve cable
  • Page 40 – Disconnect the pipe and then move the pump to the right; Pump
  • Page 41 – After opening the control boz, disconnect; Twist the fl ow switch assembly to disengage
  • Page 42 – Legend; Left hand hydraulic block; Left hand Hydraulic block assembly
  • Page 43 – Unscrew the condense trap from the condense body
  • Page 44 – Unplug the electrical connectors; clip and pull the assembly toward you; Temperature Sensor
  • Page 45 – Remove the clip and lift the manual air vent from the exchanger
  • Page 46 – Burner unit
  • Page 47 – Remove the screw and the spark generator; Unplug the electrodes; Spark generator
  • Page 48 – : Any work carried out on the; Power; Burner
  • Page 49 – Remove the combustion assembly; Fan & Mixer venturi according to the model
  • Page 50 – Gas valve; : When changing the gas valve, the new gas valve is not; B a y o n e t
  • Page 53 – GAS BOILER SYSTEM COMMISSIONING CHECKLIST
  • Page 54 – SERVICE RECORD
  • Page 55 – DQIGDWH; SHORT LIST
  • Page 56 – Ariston Thermo UK Ltd
Loading the manual

24/30/38

CONDENSING WALL HUNG

COMBINATION BOILER

G.C.N : 47 - 116 - 62 (24 kW)

G.C.N : 47 - 116 - 63 (30 kW)

G.C.N : 47 - 116 - 64 (38 kW)

CONDENSING WALL HUNG

O.H. BOILER

G.C.N : 41 - 116 - 34 (24 kW)

G.C.N : 41 - 116 - 35 (30 kW)

,QVWDOODWLRQDQG6HUYLFLQJLQVWUXFWLRQV

E-Combi

24/30

E-System

Country of destination GB, IE

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - INDEX

INDEX Overview .......................................................................................... 3 General Information ............................................................................................. 3Advice for the Installer .......................................................

Page 3 - overview; Do not forget to complete the Benchmark Commisioning Checklist.; TECHNICAL DEPARTMENT

overview 3 These instructions are suitable for E-COMBI and E-SYSTEM boilers : Do not forget to complete the Benchmark Commisioning Checklist. T he Benchmark Scheme Benchmark places responsibilities on both manufacturers and installers. The purpose is to ensure that customers are provided with the co...

Page 4 - Advice for the installer

overview 4 Advice for the installer The installation and fi rst ignition of the boiler must be performed by qualifi ed personnel in compliance with current national regulations regarding installation, and in conformity with any requirements established by local authorities and public health organisa...

Other Ariston Models

All Ariston Other