Page 3 - About This Manual; Audience; InfraStruXure 60 kW Installation; Companion manuals; User Manuals
60 kW InfraStruXure PDU—Operation and Configuration i About This Manual Audience This manual is intended for end-users of a 60 kW InfraStruXure PDU. It covers the operation and basic network configuration of the PDU, and includes basic InfraStruXure system operation. For additional information about...
Page 5 - Contents
Contents 60 kW InfraStruXure PDU — Operation and Configuration iii Safety ......................................................................1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Save these instructions . . . . . . . . . . . . . . . . . . ....
Page 7 - How to Download Firmware; Up grades
60 kW InfraStruXure PDU — Operation and Configuration v Configuring the Network Management Interface . . . . . . . . . . . 37 Connect the InfraStruXure PDU to your network . . . . . . . . . 37 Configuration Overview . . . . . . . . . . . . . . . . . . . . . . . . . . 37 TCP/IP configuration methods ...
Page 9 - Safety; Overview; Save these instructions; Indicates important information.
60 kW InfraStruXure PDU — Operation and Configuration 1 Safety Overview Save these instructions This manual contains important instructions that must be followed during installation, operation, and maintenance of the InfraStruXure PDU. Safety symbols used in this manual Cross-reference symbols used ...
Page 10 - Warnings; Installation/Maintenance; Only a certified electrician can:; Maintenance performed while the PDU is receiving input power; live electrical installation.; Input Voltage
2 60 kW InfraStruXure PDU — Operation and Configuration Warnings Receiving/moving Do not tilt the PDU greater than 45° from its vertical axis. Never lay the PDU on its side. Installation/Maintenance Only a certified electrician can: • Connect the PDU to its power source• Connect a switch to the EPO ...
Page 11 - Total power off procedure; power source; on the InfraStruXure PDU.; Main Output; circuit breakers on the front of the PDU.
Safety 60 kW InfraStruXure PDU — Operation and Configuration 3 Total power off procedure 1. Open (turn OFF) the main circuit breaker of the power source feeding the PDU. 2. Open (turn OFF) the Main Input on the InfraStruXure PDU. 3. If applicable, open (turn OFF) the Main Output circuit breakers on ...
Page 12 - EMI; This Class A digital apparatus complies with Canadian ICES-003.
Safety 4 60 kW InfraStruXure PDU — Operation and Configuration EMI This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the e...
Page 13 - InfraStruXure PDU; Front view; PDU Shielding
60 kW InfraStruXure PDU—Operation and Configuration 5 Overview InfraStruXure PDU Front view The PDU Shielding Trough accommodates the power cables exiting the roof of the PDU, and separates power cables from data cables. The PDU power cables supply power to equipment racks; they are fed through ...
Page 14 - 2-position circuit breaker panels
Overview 6 60 kW InfraStruXure PDU—Operation and Configuration Front view (interior) The 42-position circuit breaker panels provide 84 total pole positions. Each single pole provides power at 120 volts L-N or two single poles provide 208 volts L-L. The amperage each position provides depends on th...
Page 15 - Rear view of PDU with transformer (interior); Main Input
Overview 60 kW InfraStruXure PDU—Operation and Configuration 7 Rear view of PDU with transformer (interior) The Main Input switch connects to your main power source. The switch accepts 208 V, 480 V, or 600 V input and requires 3-wire input conductors. The PDU monitoring unit has several current ...
Page 16 - Rear view of PDU without transformer (interior); The; circuit breaker connects to the main power source; PDU monitoring unit; has several current and voltage monitoring
Overview 8 60 kW InfraStruXure PDU—Operation and Configuration Rear view of PDU without transformer (interior) The Main Input circuit breaker connects to the main power source (UPS or utility). The breaker accepts 208V input and requires 4-wire input conductors. Note: This circuit breaker also ser...
Page 18 - User connection plate; For a description and location of the user connection plate, see (
Overview 10 60 kW InfraStruXure PDU—Operation and Configuration User connection plate For a description and location of the user connection plate, see ( ) on page 6. For clarity, the following illustration shows the user connection plate in greater detail. Connect the InfraStruXure PDU to the ne...
Page 19 - Multi-Branch Cordset Adapters; Compatible APC 120 V PDUs
60 kW InfraStruXure PDU—Operation and Configuration 11 Multi-Branch Cordset Adapters APC offers three Multi-Branch Cordset Adapters. The adapters connect to a multi-branch power cord (whip) on the PDU and distribute three separate branches to Rack PDUs in your equipment racks. See the table below fo...
Page 20 - Compatible APC 208 V PDUs
Overview 12 60 kW InfraStruXure PDU—Operation and Configuration Compatible APC 208 V PDUs SKU # Plug Outlets Manageable AP7540 L6-20P (20) IEC 320 C13 (4) IEC 320 C19 No AP7840 L6-20P (20) IEC 320 C13 (4) IEC 320 C19 Yes AP7940 L6-20P (21) IEC 320 C13 (3) IEC 320 C19 Yes AP9510L620 L6-20P (1) NEMA L...
Page 21 - PDU Display Interface
60 kW InfraStruXure PDU — Operation and Configuration 13 PDU Display Interface Overview Use the display interface to configure settings, set alarm thresholds, and provide audible and visual alarms. ESC ? LoadPowered Chec kLog Bypass Alarm Load Powered LED When green, all output p...
Page 22 - Top-level status screens; Navigating through screens
PDU Display Interface 14 60 kW InfraStruXure PDU — Operation and Configuration Top-level status screens After system start-up, the display interface displays a brief start-up screen and then scrolls automatically and continuously through four screens of basic status information. Press the Up and Dow...
Page 23 - Password-protected screens
PDU Display Interface 60 kW InfraStruXure PDU — Operation and Configuration 15 On some screens, continue arrows ( indicate that there are additional screens to view in the category. Press the Up or Down arrow key to view the additional screens. Password-protected screens When configuring or chang...
Page 25 - From the; Output Voltage; for phase L1 to
60 kW InfraStruXure PDU — Operation and Configuration 17 Volt-Meter Screen From the Volt-Meter screen, you can select the following items: Output Voltage Displays each phase-to-phase output voltage (e.g., L1-2 for phase L1 to phase L2) and each phase-to-neutral output voltage (e.g., L1 for phase L1 ...
Page 26 - Contacts Screen
18 60 kW InfraStruXure PDU — Operation and Configuration Contacts Screen Overview The PDU can monitor external contact closure events. Possible applications include the following: • Magnetic contact switches• Window foil• Tamper switches• Heat detectors• Water sensors• Pressure sensors• Building smo...
Page 27 - corresponds to the first of four relay outputs. The second
PDU Display Interface 60 kW InfraStruXure PDU — Operation and Configuration 19 Alarm Relay Map Configure the relay outputs, using the Alarm Relay Map. Each Alarm Map corresponds to an relay output. For example, Alarm Map 01of04 corresponds to the first of four relay outputs. The second line, in brac...
Page 28 - How to connect contacts to the PDU monitoring unit
PDU Display Interface 20 60 kW InfraStruXure PDU — Operation and Configuration How to connect contacts to the PDU monitoring unit 1. Choose one or more contact number on the User/EPO contacts port on the user connection plate to which you will connect the contacts. The user connection plate connects...
Page 29 - Breakers Screen; Use the; Breakers; screen to view the status of the system and PDU circuit breakers.; Reports status of PDU Main Input Switch (; Open; or; Under normal operation, this switch is; Closed
60 kW InfraStruXure PDU — Operation and Configuration 21 Breakers Screen Use the Breakers screen to view the status of the system and PDU circuit breakers. Main Input Reports status of PDU Main Input Switch ( Open or Closed ). Under normal operation, this switch is Closed .
Page 30 - Alarms Screen; View Active Alarms; Alarms; Entire Log; Clear Log
22 60 kW InfraStruXure PDU — Operation and Configuration Alarms Screen View Active Alarms Use this option of the Alarms screen to display active alarms (alarms that have not been resolved). Scroll through the list to view each active alarm. Alarm/Event Log Use this selection of the Alarms screen to ...
Page 31 - Alarm Setup
PDU Display Interface 60 kW InfraStruXure PDU — Operation and Configuration 23 Alarm Setup Use this option of the Alarms screen to access the following options: Alarm Beeper Use this option of the Alarms screen to turn the alarm beeper ON or OFF. Loading Limits Configure the following in amps and as...
Page 32 - PDU Alarms; All Possible Alarms
PDU Display Interface 24 60 kW InfraStruXure PDU — Operation and Configuration PDU Alarms This table lists all alarms that can be generated by the PDU, as displayed by the All Possible Alarms option, with numeric variables between the < > characters. Logged alarms will display specific numbers...
Page 33 - Panel Screen; Branch Ckt Loading; Branch Ckt Limits
60 kW InfraStruXure PDU — Operation and Configuration 25 Panel Screen Branch Ckt Loading You can display Branch Ckt Loading (Branch Circuit Loading) status if the option to measure current at the distribution circuit breakers is installed. You can view data for each individual panel position on the ...
Page 34 - Panel Configuration; Pos
PDU Display Interface 26 60 kW InfraStruXure PDU — Operation and Configuration Panel Configuration Configure the branch metering settings for each circuit breaker on the distribution panel, or configure both panels simultaneously. To configure a circuit breaker, select the range that includes the ci...
Page 35 - Global Panel Config; Poles; Apply Now; and; YES; to implement your changes.
PDU Display Interface 60 kW InfraStruXure PDU — Operation and Configuration 27 Global Panel Config Configures the same number of poles or circuit breaker ratings for all circuit breakers in both distribution panels simultaneously. For example, if your system uses only 3-pole, 20-amp circuit breakers...
Page 36 - Config Screen
28 60 kW InfraStruXure PDU — Operation and Configuration Config Screen System/Network Use this option of the Config screen to access these options: System Password • Password : Change the system password required to access protected screens and fields in the display interface. Enter a string of up t...
Page 37 - Electrical Config
PDU Display Interface 60 kW InfraStruXure PDU — Operation and Configuration 29 Electrical Config This option of the Config screen displays information about the electrical service that provides input to the PDU. All of the values displayed on this screen are set at the factory. Use this information ...
Page 38 - Factory Defaults; Config; Firmware Updates; Use this option of the; Config; screen to download updated firmware to the PDU.
PDU Display Interface 30 60 kW InfraStruXure PDU — Operation and Configuration Factory Defaults Use this option of the Config screen to reset all PDU settings to their factory default values. Firmware Updates Use this option of the Config screen to download updated firmware to the PDU.
Page 39 - Operation; How to Apply Power to the System; For
60 kW InfraStruXure PDU—Operation and Configuration 31 Operation How to Apply Power to the System 1. Close (turn ON) the main circuit breaker of the power source supplying power to the PDU. 2. Close (turn ON) the Main Input on the InfraStruXure PDU. 3. Power the PDU distribution circuit breakers: a....
Page 40 - For PDUs with and without a transformer:; distribution; When the; distribution panel; circuit breakers are closed, the PDU power cables
Operation 32 60 kW InfraStruXure PDU—Operation and Configuration b. For PDUs with and without a transformer: Close (turn ON) the PDU distribution panel circuit breakers. Note When the distribution panel circuit breakers are closed, the PDU power cables and connected equipment are energized.
Page 41 - How to Ensure Total Power Off; on the; circuit breakers on
60 kW InfraStruXure PDU—Operation and Configuration 33 How to Ensure Total Power Off 1. Open (turn OFF) the main circuit breaker on the power source feeding the PDU. 2. Open (turn OFF) the Main Input on the InfraStruXure PDU. 3. For PDU with transformer : Open (turn OFF) the Main Output circuit brea...
Page 43 - Communication Configuration; InfraStruXure PDU Management Options
60 kW InfraStruXure PDU—Operation and Configuration 35 Communication Configuration InfraStruXure PDU Management Options Overview You have two management options for the InfraStruXure PDU. You can manage the InfraStruXure PDU along with the rest of your InfraStruXure equipment through the InfraStruXu...
Page 44 - Configuring the InfraStruXure Manager; Connect the InfraStruXure PDU to the InfraStruXure Manager; Information Controller Hub.; Installation and
36 60 kW InfraStruXure PDU—Operation and Configuration Configuring the InfraStruXure Manager Connect the InfraStruXure PDU to the InfraStruXure Manager 1. Connect a Cat-5 network cable to the surge-protected ethernet port on the PDU user connection plate. You can make connections from inside the enc...
Page 45 - Connect the InfraStruXure PDU to your network; Network Management User’s Guide
60 kW InfraStruXure PDU—Operation and Configuration 37 Configuring the Network Management Interface Connect the InfraStruXure PDU to your network 1. Connect a Cat-5 network cable to the surge-protected ethernet port on the PDU user connection plate. You can make connections from inside the enclosure...
Page 46 - TCP/IP configuration methods; Utility; Start; Network; Start a Web browser when finished
Communication Configuration 38 60 kW InfraStruXure PDU—Operation and Configuration TCP/IP configuration methods Use one of the following methods to define the TCP/IP settings needed by the InfraStruXure PDU: • Device IP Configuration Wizard (See “Device IP Configuration Wizard” on this page.) • BOOT...
Page 47 - BOOTP & DHCP configuration
Communication Configuration 60 kW InfraStruXure PDU—Operation and Configuration 39 BOOTP & DHCP configuration The Boot Mode Setting, a TCP/IP option in the InfraStruXure PDU’s Network menu, identifies how the TCP/IP settings will be defined. The possible settings are Manual , DHCP only , BOOTP o...
Page 48 - User Name; DHCP Cookie Is
Communication Configuration 40 60 kW InfraStruXure PDU—Operation and Configuration 3. When the InfraStruXure PDU reboots, the BOOTP server provides it with the TCP/IP settings. – If you specified a bootup file name, the InfraStruXure PDU attempts to transfer that file from the BOOTP server using TFT...
Page 49 - Local access to the control console; Remote access to the control console
Communication Configuration 60 kW InfraStruXure PDU—Operation and Configuration 41 Local access to the control console You can use a local computer that connects to the InfraStruXure PDU through the console port on the InfraStruXure PDU monitoring unit to access the control console. 1. Select a seri...
Page 50 - Control console
Communication Configuration 42 60 kW InfraStruXure PDU—Operation and Configuration 2. Use Ping with a size of 113 bytes to assign the IP address defined by the ARP command. For the IP address defined in step 1, use one of the following Ping commands: – Windows command format: ping 156.205.14.141 -l ...
Page 51 - Web interface; Installation
60 kW InfraStruXure PDU—Operation and Configuration 43 How to Access a Network Management Interface on a Configured InfraStruXure PDU Web interface As your browser, you can use Microsoft ® Internet Explorer 5.0 (and higher) or Netscape ® 4.0.8 (and higher, except Netscape 6. x ) to access the InfraS...
Page 52 - Telnet for basic access.; SNMP
Communication Configuration 44 60 kW InfraStruXure PDU—Operation and Configuration Telnet for basic access. Telnet provides the basic security of authentication by user name and password, but not the high-security benefits of encryption. To use Telnet to access an InfraStruXure PDU’s control console...
Page 53 - FTP and SCP
Communication Configuration 60 kW InfraStruXure PDU—Operation and Configuration 45 FTP and SCP You can use FTP (enabled by default) or Secure CoPy (SCP) to transfer new firmware to the InfraStruXure PDU, or to access a copy of the InfraStruXure PDU’s event logs. SCP provides the higher security of e...
Page 55 - Customizing and Updating the PDU; Important Safety Instructions; in the hazards of live electrical installation.
60 kW InfraStruXure PDU — Operation and Configuration 47 Customizing and Updating the PDU Important Safety Instructions Electrical Hazard APC does not recommend that you perform maintenance of the PDU while it is receiving input power. However, due to the critical nature of data center loads, this m...
Page 56 - PDU Orderable Part List; Circuit Breakers; Power Cables
48 60 kW InfraStruXure PDU — Operation and Configuration PDU Orderable Part List Circuit Breakers PD1P20ABBSD single-pole, 20-amp breaker PD3P20ABBSD three-pole, 20-amp breaker PD1P50ABBSD single-pole, 50-amp breaker PD3P80ABBSD three-pole, 80-amp breaker PD2P20ABBSD two-pole, 20-amp breaker PD3P100...
Page 58 - Add a circuit breaker on the PDU; Snap and bolt the new; Add a power cable to the PDU; Before adding a power cable, add a circuit breaker.
50 60 kW InfraStruXure PDU — Operation and Configuration How to Add Circuit Breakers and Power Cables Add a circuit breaker on the PDU 1. Snap and bolt the new circuit breaker into a position on the panel. 2. Remove the corresponding plastic blanking plate on the front panel of the PDU. Add a power ...
Page 59 - At the front of the PDU, connect the power cord’s individual wires:
Customizing and Updating the PDU 60 kW InfraStruXure PDU — Operation and Configuration 51 4. At the front of the PDU, connect the power cord’s individual wires: a. If you have branch current monitoring installed, route the phase conductor through a current sensor. If it is a three-phase cable, route...
Page 62 - How to Test the EPO Switch
54 60 kW InfraStruXure PDU — Operation and Configuration How to Test the EPO Switch After a certified electrician has connected an EPO switch to the PDU monitoring unit by way of the user connection plate, you can easily test the switch to make sure it is wired and working properly. The illustration...
Page 63 - Arm; Safety warnings; Problem
Customizing and Updating the PDU 60 kW InfraStruXure PDU — Operation and Configuration 55 4. If the test was successful, place the Arm/Test switch back to the Arm position. The PDU display interface will clear the EPO test mode alarm. If the test was not successful, see the troubleshooting chart: 5....
Page 65 - How to Download Firmware Upgrades; Upgrading the PDU monitor processor
60 kW InfraStruXure PDU — Operation and Configuration 57 How to Download Firmware Upgrades Upgrading the PDU monitor processor You can download available PDU monitor processor upgrades through the PDU display interface. The most obvious indication that a firmware upgrade is necessary occurs when the...
Page 66 - Control Console
Customizing and Updating the PDU 58 60 kW InfraStruXure PDU — Operation and Configuration 6. From the Control Console menu, select System , then Tools , then File Transfer , then XMODEM . 7. The system will prompt you with Perform transfer with XMODEM -CRC? Type Yes and press E NTER . 8. The system ...
Page 67 - Specifications; 0 kW InfraStruXure PDU
60 kW InfraStruXure PDU — Operation and Configuration 59 Specifications 60 kW InfraStruXure PDU Electrical 208 V 480 V 600 V 208 V (transformerless) Input Nominal Voltage 208/120 V 480/277 V 600/346 V 208/120 V Frequency 57 – 63 Hz 57 – 63 Hz 57 – 63 Hz 57 – 63 Hz Voltage AC 3-phase, 3-wire 3-phase,...
Page 69 - Product Information; InfraStruXure Standard Warranty
60 kW InfraStruXure PDU — Operation and Configuration 61 Product Information InfraStruXure Standard Warranty APC warrants that all components of the InfraStruXure system will be free from defect in material and workmanship for a period of two years from the date of start up when start up has been pe...
Page 71 - APC Three-Phase Systems
60 kW InfraStruXure PDU — Operation and Configuration 63 Life-Support Policy APC Three-Phase Systems As a general policy, American Power Conversion Corporation and its affiliates and subsidiaries worldwide (APC) do not recommend the use of any of its products in life support applications where failu...
Page 72 - How to Obtain Service; How to contact APC; Global support searching APC Knowledge Base and using e-support.
64 60 kW InfraStruXure PDU — Operation and Configuration How to Obtain Service How to contact APC Customer support for this or any other APC product is available at no charge in any of the following ways: • Visit the APC Web site to access documents in the APC Knowledge Base and to submit any custom...
Page 73 - Appendix: Changes in This Manual
60kW InfraStruXure PDU—Operation and Configuration 65 Appendix: Changes in This Manual Overview The following list references the specific changes that have been made to this manual since its last release (990-1600B). General changes Updated manual to reflect the InfraStruXure PDU’s network manageme...
Page 75 - Index
Index 60kW InfraStruXure PDU—Operation and Configuration 67 A Add a circuit breaker or power cable on the PDU , 50 Agency approvals , 60 Alarm beeper , 23 Alarm event log , 22 Alarm LED , 13 Alarm relay map , 19 Alarms screen , 22 – 24 Arm/test rocker switch , 9 B BOOTP & DHCP configuration , 39...
Page 80 - APC Worldwide Customer Support
*990-1600C* APC Worldwide Customer Support Customer support for this or any other APC product is available at no charge in any of the following ways: • Visit the APC Web site to access documents in the APC Knowledge Base and to submit customer support requests.– www.apc.com (Corporate Headquarters) ...