APC PD150L6F - Manual

APC PD150L6F

APC PD150L6F – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
51 Page 51
52 Page 52
53 Page 53
54 Page 54
55 Page 55
56 Page 56
57 Page 57
58 Page 58
59 Page 59
60 Page 60
61 Page 61
62 Page 62
63 Page 63
64 Page 64
65 Page 65
66 Page 66
67 Page 67
68 Page 68
69 Page 69
70 Page 70
71 Page 71
72 Page 72
73 Page 73
74 Page 74
75 Page 75
76 Page 76
77 Page 77
78 Page 78
79 Page 79
80 Page 80
81 Page 81
82 Page 82
83 Page 83
84 Page 84
Page: / 84

Table of Contents:

  • Page 3 – About this Manual
  • Page 5 – Contents
  • Page 9 – Safety; Overview; Save these instructions
  • Page 10 – Warnings; Installation/maintenance
  • Page 11 – Total power off procedure; Main Input
  • Page 12 – EMI
  • Page 13 – InfraStruXure PDU Components
  • Page 14 – InfraStruXure PDU; Front view; PDU power cables
  • Page 15 – Main Output
  • Page 16 – Rear view; document pocket
  • Page 17 – PDU monitoring unit
  • Page 19 – Display port; Branch Current Monitor
  • Page 20 – User connection plate; ethernet port; input contact connections; relay output connections; EPO
  • Page 21 – PDU Display Interface
  • Page 22 – Top-level status screens; Navigating through screens
  • Page 23 – Password-protected screens
  • Page 25 – Output Voltage
  • Page 26 – Contacts Screen
  • Page 28 – How to connect contacts to the PDU monitoring unit.
  • Page 29 – Breakers Screen; Open; Closed
  • Page 30 – Alarms Screen; View Active Alarms; Alarms; Entire Log; Clear Log
  • Page 31 – Alarm Setup
  • Page 32 – PDU Alarms; All Possible
  • Page 33 – Panel Screen; Branch Ckt Loading; Branch Ckt Limits
  • Page 34 – Panel Configuration; Pos
  • Page 35 – Global Panel Config; Poles; Apply Now; YES
  • Page 36 – Config Screen
  • Page 37 – Electrical Config
  • Page 38 – System ID
  • Page 39 – Operation; How to Apply Power to the System; power source
  • Page 40 – distribution; distribution panel
  • Page 41 – How to Ensure Total Power Off
  • Page 43 – Communication Configuration; InfraStruXure PDU Management Options
  • Page 44 – Configuring the InfraStruXure Manager; Connect the InfraStruXure PDU to the InfraStruXure Manager
  • Page 45 – Connect the InfraStruXure PDU to your network
  • Page 46 – TCP/IP configuration methods; Start; Start a Web browser when finished
  • Page 47 – BOOTP & DHCP configuration
  • Page 48 – User Name
  • Page 49 – DHCP Cookie Is
  • Page 50 – Local access to the control console; Remote access to the control console
  • Page 51 – Control console
  • Page 52 – Web interface
  • Page 53 – Telnet for basic access.; SNMP
  • Page 54 – FTP and SCP
  • Page 57 – Customizing and Updating the PDU; Important Safety Instructions; in the hazards of live electrical installation.
  • Page 58 – PDU Orderable Part List; Breakers
  • Page 59 – Power Cables
  • Page 60 – Add a circuit breaker on the PDU; Add a power cable to the PDU
  • Page 63 – How to attach the circuit breaker to the mounting brackets
  • Page 64 – How to connect the sub-feed cable to the circuit breaker; neutral wire
  • Page 66 – How to connect contacts to the PDU monitoring unit
  • Page 67 – Connecting the switch.; Configuring and testing.; Test
  • Page 68 – – Contact Closure—Normally Open; Normally
  • Page 70 – Safety warnings
  • Page 71 – How to Download Firmware Updates; From a local computer
  • Page 73 – Specifications; 50 kW InfraStruXure PDU
  • Page 75 – Product Information; Warranty; InfraStruXure Standard Warranty
  • Page 77 – APC Three-Phase Systems
  • Page 78 – How to Obtain Service; How to contact APC
  • Page 79 – Index
  • Page 84 – APC Worldwide Customer Support
Loading the manual

150 kW InfraStruXure PDU

PD150G6F

PD150L6F

480 V/ 600 V Input

Operation and Configuration

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 3 - About this Manual

150kW InfraStruXure PDU—Operation and Configuration i About this Manual This manual is intended for end-users of a 150 kW InfraStruXure PDU. It covers the operation and quick-configuration of the PDU, and includes basic InfraStruXure system operation. For additional information about the InfraStruXu...

Page 5 - Contents

Contents 150kW InfraStruXure PDU—Operation and Configuration iii Safety ......................................................................1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Save these instructions . . . . . . . . . . . . . . . . . . . ....

Page 9 - Safety; Overview; Save these instructions

150kW InfraStruXure PDU—Operation and Configuration 1 Safety Overview Save these instructions This manual contains important instructions that must be followed during installation, operation, and configuration of the InfraStruXure PDU. Safety symbols used in this manual Cross-reference symbols used ...

Other APC Models

All APC Other