APC MX28B4800 - Manual

APC MX28B4800

APC MX28B4800 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
51 Page 51
52 Page 52
53 Page 53
54 Page 54
55 Page 55
56 Page 56
57 Page 57
58 Page 58
59 Page 59
60 Page 60
61 Page 61
62 Page 62
63 Page 63
64 Page 64
65 Page 65
66 Page 66
67 Page 67
68 Page 68
69 Page 69
70 Page 70
Page: / 70

Table of Contents:

  • Page 2 – Table of Contents; AC P
  • Page 3 – DC D
  • Page 5 – Revision History; Revision Date By; JNF Converted to APC numbering; Table of Figures
  • Page 6 – Safety
  • Page 7 – Introduction; A block diagram is shown in
  • Page 10 – Installation; Section 7
  • Page 11 – Mounting; shows the footprint of the box frame and the; Power Bus Connections; for details. The power bays are spliced together
  • Page 13 – Circuit Breaker/LVD Ribbon Cable Connections; as a guide to jumper orientation. If a cable is
  • Page 14 – Fuse Alarm Ribbon Cable Connections; Ventilation; for environmental characteristics.] Free airflow should be; WARNING; : Ensure that all of the external DC and AC circuit breakers are in
  • Page 15 – Do; Figure
  • Page 16 – : The MX28B DC power plant is supplied from a high voltage; : Hazardous energy levels are present on bare conductors in the -
  • Page 17 – : Make certain that the battery polarity is correct when making
  • Page 19 – DC Plug-in Circuit Breakers
  • Page 22 – DC Bolt-in Circuit Breakers
  • Page 23 – Telecom Fuses
  • Page 24 – Installation of Circuit Breakers and Fuses; CAUTION; terminal board as the breaker is snapped into place.; when it is turned OFF.
  • Page 25 – Bolt-in Circuit Breaker Installation; Reattach the circuit breaker cover panel.
  • Page 26 – Telecom Fuse Installation; Re-install the fuse holder by pushing the holder straight in.; GMT Fuse Installation
  • Page 27 – Each return bus provides 28 sets of
  • Page 28 – GMT Fuse Connections; Monitoring and Relay Output Connections; Front Panel DB9 Connection
  • Page 30 – MINOR
  • Page 31 – : Rectifier DC output circuits would be damaged if battery were; : Rectifier fan inlet filters are available for dusty or hostile
  • Page 32 – Commissioning and Preventive Maintenance; Environment
  • Page 33 – manufacturer’s specifications.; AC Power Up; : The DC power plant is supplied from a nominal high voltage AC
  • Page 34 – LVD Test; at the battery connection. Also, the minor alarm should be on.; Battery Power Up; links. Arcing can occur during this connection.
  • Page 35 – User Inputs
  • Page 37 – Operation; DC Output Power
  • Page 39 – System Status and Alarm Reporting; for PSCU control functions.; Circuit breaker alarm contacts close when the
  • Page 40 – Battery/Load Low Voltage Disconnect; LVD 1 Trip Voltage
  • Page 41 – APC; Parameter Locations, Descriptions, and Default Values; . To find the parameters that can be
  • Page 51 – Control Unit Menu Structure; T o p L e v e l S e c o n d L e v e l T h i r d L e v e l F o u r t h L e v e l
  • Page 57 – Front Panel LED Indicators
  • Page 60 – will allow the unit to be serviced without creating false alarms.; System Visual and Safety Inspection; : Hazardous energy levels are present on bare conductors
  • Page 61 – Battery Visual and Safety Inspection; only approved cleaning materials.; System Voltage Test
  • Page 62 – controller and the customer remote alarm panel.; System Temperature Test; Determine the total battery capacity at the site:
  • Page 63 – Enable the LVD’s that are installed.; Battery Preventive Maintenance Procedure; the battery memory location allocated on the Cellcorder.
  • Page 64 – copy of the results on disk.
  • Page 65 – Specifications
  • Page 66 – Rectifiers
  • Page 67 – Power Shelf Control Unit
  • Page 69 – APC Worldwide Customer Support
Loading the manual

MX28B1200/2400

MX28B1200/4800

-48 VDC POWER SYSTEMS

User’s Manual

(Document # 990-1148A)

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - Table of Contents; AC P

MX28B1200/2400 MX28B1200/4800 –48 VDC User’s Manual Page ii Table of Contents 1 SAFETY FIRST! .....................................................................................................................1 1.1. W ARNING S YMBOLS ...................................................................

Page 3 - DC D

MX28B1200/2400 MX28B1200/4800 –48 VDC User’s Manual Page iii 3.10. E XTERNAL A LARM I NPUT C ONNECTIONS ..........................................................................25 3.11. R ECTIFIER M ODULE I NSTALLATION ...................................................................................

Page 5 - Revision History; Revision Date By; JNF Converted to APC numbering; Table of Figures

MX28B1200/2400 MX28B1200/4800 –48 VDC User’s Manual Page v Revision History Revision Date By Description 1 31 JAN, 2002 JNF Converted to APC numbering 2 28 SEP, 2003 BET Updated Format and added 4800 Table of Figures FIGURE 2.2-1 MX28B-1200 –48 VDC POWER PLANT RECTIFIER BAY.............................

Other APC Models

All APC Other