Table of Contents:
Page 3 – Chapter 1 General Information; Important Safety Instructions – Save These Instructions
Page 5 – Chapter 2 Installation and Maintenance; Unpacking; SLG Enclosure; Installing the Power Supply Enclosure
Page 6 – SLG Enclosure Installation
Page 8 – Installing Batteries
Page 9 – Installing Modules; Ferroresonant Module Installation; Standby Module Installation; Note: Batteries charge during normal operation.
Page 10 – Chapter 3 Operation; Initial Startup; Allow the batteries to charge for 24 hours prior to testing.; Shut Down
Page 11 – FLM; SLM; Index Item
Page 12 – SLP/G Enclosure Bottom View
Page 13 – Chapter 4 Service, Contact and Warranty Information; Service
Loading the manual
990-5518A 10/2004
BroadBand CTSLP/G
Uninterruptible Power Supply 60 VAC
User Manual
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
Page 3 - Chapter 1 General Information; Important Safety Instructions – Save These Instructions
1 990-5518 03/02 Chapter 1 General Information The SLP/G Series Standby Power Supply provides an uninterruptible power source for broadband cable operations. Batteries are housed inside the module. A battery vault may be used to provide additional battery backup. Refer to the APC Web site, www.apc.c...
2 990-5518 03/02 Specifications Environmental Specifications Operating Temperature -40º F to +140º F (-40º C to +60º C) Humidity 5% to 95% noncondensing within enclosure Physical Specifications Characteristic Specification Height Pole Mount Ground Mount 18 ″ (45.7 cm) 25” (33 cm) Width Pole Mount/Gr...
Page 5 - Chapter 2 Installation and Maintenance; Unpacking; SLG Enclosure; Installing the Power Supply Enclosure
3 990-5518 03/02 Chapter 2 Installation and Maintenance Only trained service personnel should install and maintain the Power Supply. Prior to installing the Power Supply AC line voltage must be routed to the enclosure. Local, state, federal and/or National Electric Code (NEC) regulations regarding l...
Page 6 - SLG Enclosure Installation
4 990-5518 03/02 SLG Enclosure Installation Locate an installation site and setup the concrete pad according to local building code requirements. See the figure below for pad details. 1. Remove the rear panel of the ground mount skirt (four, #8 Phillips head screws). 2. Pull the Coax and AC lines th...
Page 8 - Installing Batteries
6 990-5518 03/02 Installing Batteries Ensure that the battery breaker is in the OFF position during battery installation. The batteries fit into a battery tray that is installed on the top shelf of the enclosure. The Thermal Switch provides temperature control during battery charge. Place the Therma...
Page 9 - Installing Modules; Ferroresonant Module Installation; Standby Module Installation; Note: Batteries charge during normal operation.
7 990-5518 03/02 Installing Modules Ferroresonant Module Installation 1. Switch the AC circuit beaker to the OFF position. 2. Locate the pin connector on the enclosure. Slide the FLM into the enclosure. The guide pin on the FLM will snap into the connector on the enclosure. 3. Switch the AC circuit ...
Page 10 - Chapter 3 Operation; Initial Startup; Allow the batteries to charge for 24 hours prior to testing.; Shut Down
8 990-5518 03/02 Chapter 3 Operation Initial Startup 1. Switch the AC circuit breaker to the ON position. 2. Verify that the FLM and SLM circuit breakers are switched to the ON position. 3. Allow 15 seconds for the SLM to run through the time delay cycle. 4. Check the battery float voltage on the ch...
Page 11 - FLM; SLM; Index Item
9 990-5518 03/02 FLM Index Item Description 1 Auxiliary AC Input Plug Provides connection point to operate Power Supply from a generator. 2 AC Auxiliary Receptacle Provides access to utility power for field tools, lights, etc. 3 Ammeter (optional) Displays output current while in normal mode. 4 15 A...
Page 12 - SLP/G Enclosure Bottom View
10 990-5518 03/02 SLP/G Enclosure Bottom View Index Item Description 1 AC input Entry point for AC line conduit. 2 Normal/Main Indicator LED Green LED, illuminates during normal operation of FLM power supply. 3 Standby/Main Red LED, illuminates during SLM backup operation. 4 Output Cable Adapter Coa...
Page 13 - Chapter 4 Service, Contact and Warranty Information; Service
11 990-5518 03/02 Chapter 4 Service, Contact and Warranty Information Service APC makes every effort to ensure parts and equipment arrive in working condition. Occasionally, it may be necessary to return parts or equipment that are not in working condition. If the unit requires service do not return...