APC 990-2485 - Manual

APC 990-2485

APC 990-2485 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
Page: / 10

Table of Contents:

  • Page 3 – Introduction; About this unit; The American Power Conversion (APC; Unpack package contents; Read the Safety Guide before installing the unit.; Check the package contents:; additional label is located on the chassis under the front bezel.; Hardware
  • Page 4 – Specifications; Environmental Specifications
  • Page 5 – Installation; Stack configuration; Install rails in rack.; Rack-mount configuration; Install rack-mounting brackets
  • Page 8 – Operation; Battery LED; LED Activity; XLBP LED illuminates briefly; XLBP; Service; Battery module and pair identification; The PowerView will reference XLBP configuration in the
  • Page 9 – Maintenance and Service Information; Replace battery modules; Contact APC Customer Support through the APC Web site,; APC Worldwide Customer Support; replacement battery packing material.
Loading the manual

990-2485

03/2007

APC Smart-UPS

®

XL

SURT192RMXLBP2

SURT192XLBP2

Stack/Rack-Mount 6U

External Battery Pack

User Manual

English

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 3 - Introduction; About this unit; The American Power Conversion (APC; Unpack package contents; Read the Safety Guide before installing the unit.; Check the package contents:; additional label is located on the chassis under the front bezel.; Hardware

SURT192RMXLBP2/SURT192XLBP2 6U User Manual 3 Introduction About this unit The American Power Conversion (APC ® ) SURT192RMXLBP2 external battery pack (XLBP) connects to an APC Smart-UPS ® RT greater than 10 kVA. Together these units provide extended protection for electronic equipment from utility p...

Page 4 - Specifications; Environmental Specifications

4 SURT192RMXLBP2/SURT192XLBP2 6U User Manual Specifications Environmental Specifications Physical Specifications Temperature Operating Storage 32 ° to 104 ° F (0 ° to 40 ° C) 5 ° to 113 ° F (-15 ° to 45 ° C) charge the UPS battery every six months86 ° to 158 ° F (30 ° to 70 ° C) charge the UPS batte...

Page 5 - Installation; Stack configuration; Install rails in rack.; Rack-mount configuration; Install rack-mounting brackets

SURT192RMXLBP2/SURT192XLBP2 6U User Manual 5 Installation Stack configuration Rack-mount configuration Install rails in rack. For details on rail installation refer to the instructions included in the rail kit package. Mount units in rack The UPS and XLBP(s) should be installed at or near the bottom...

Other APC Models

All APC Other