Allied Telesis AT-9000/28 - Manual

Allied Telesis AT-9000/28

Allied Telesis AT-9000/28 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
Page: / 50

Table of Contents:

  • Page 3 – Electrical Safety and Emissions Standards
  • Page 4 – Translated Safety Statements
  • Page 7 – Preface
  • Page 8 – Safety Symbols Used in this Document
  • Page 9 – Where to Find Web-based Guides
  • Page 10 – Contacting Allied Telesis
  • Page 11 – Chapter 1; Overview
  • Page 12 – Switch Features
  • Page 13 – Front and Back Panels
  • Page 14 – Gigabit Ethernet Ports; Twisted Pair
  • Page 15 – Uplink Ports; Port
  • Page 16 – LEDs; System LEDs; Figure 3
  • Page 17 – LINK LED
  • Page 19 – SFP LEDs
  • Page 20 – ecoSwitch
  • Page 21 – Ethernet Switching Basics; MAC Address
  • Page 25 – Chapter 2; Installing the Switch
  • Page 26 – Reviewing Safety Precautions
  • Page 28 – Selecting a Site
  • Page 29 – Twisted Pair and Fiber Optic Cable Specifications
  • Page 30 – Unpacking the Switch
  • Page 31 – Installing the Switch in a Rack
  • Page 33 – Installing Optional Transceivers; Installing an SFP
  • Page 35 – Cabling the Twisted Pair or Fiber Optic Ports
  • Page 36 – Applying AC Power
  • Page 37 – Starting a Local Management Session
  • Page 39 – Warranty Registration
  • Page 41 – Chapter 3; Troubleshooting
  • Page 42 – Power LED is Off
  • Page 43 – Twisted Pair Port Link LED is Off
  • Page 44 – Fiber Optic Port Link LED is Off
  • Page 47 – Appendix A; Technical Specifications; Physical Specifications; Power Specifications
  • Page 48 – Safety and Electromagnetic Emissions Certifications; Compliance Standards
  • Page 50 – Console Port Pinouts
Loading the manual

613-001058 Rev. A

AT-9000/28
Managed Layer 2
GE ecoSwitch

Installation Guide

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 3 - Electrical Safety and Emissions Standards

3 Electrical Safety and Emissions Standards This product meets the following standards. RFI Emissions FCC Class A, EN55022 Class A, VCCI Class A, C-TICK, CE EMC (Immunity) EN55024, EN61000-3-2, EN61000-3-3 Electrical Safety EN60950-1 (TUV), UL 60950-1 ( C UL US ) U.S. Federal Communications Commissi...

Page 4 - Translated Safety Statements

4 Translated Safety Statements Important: The indicates that a translation of the safety statement is available in a PDF document titled “Translated Safety Statements” (613-000990) posted on the Allied Telesis website at www.alliedtelesis.com. This document is also included with the documentation CD...

Page 7 - Preface

7 Preface This guide provides the hardware installation instructions for you to install the AT-9000/28 Gigabit Ethernet ecoSwitch. This preface contains the following sections: ˆ “Safety Symbols Used in this Document” on page 8 ˆ “Where to Find Web-based Guides” on page 9 ˆ “Contacting Allied Telesi...

Other Allied Telesis Models

All Allied Telesis Other