Page 3 - Warranty/Limitation of Liability; Basic Warranty
iii Warranty/Limitation of Liability Basic Warranty In the absence of any optional warranty or continuing provisions by formal agreement, Acer warrants its products in accordance with the schedules listed below. Purchaser hereafter mentioned refers at all times to the customer who purchased Acer pro...
Page 5 - Notices; FCC notice
v Notices FCC notice This device has been tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a commercial environment. residential installation. This ...
Page 6 - European Community Statement
vi Use conditions This part complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. European...
Page 7 - Important safety instructions
vii Important safety instructions Read these instructions carefully. Save these instructions for future reference. 1. Follow all warnings and instructions marked on the product. 2. Unplug this product from the wall outlet before cleaning. Do not use liquid cleaners or aerosol cleaners. Use a damp cl...
Page 9 - Contents; Introduction
Contents Warranty/Limitation of Liability iii Basic Warranty iii Altos S300 Warranty iii Cable Warranty iii Notices v FCC notice v European Community Statement vi Important safety instructions vii 1 Introduction 1 About the Altos S300 series storage array 3 Features 4 Disk drive carrier 5 Power supp...
Page 14 - Features
1 Introduction 4 Features • Fourteen disk drive slots. • Redundant AC power supplies. • Redundant input power cords. • A total of four fans in two Advanced Cooling Modules (ACM) providing n+1 redundancy on fans. • Two rear removable I/O option modules provide active/passive failure redundancy on env...
Page 16 - Cooling system
1 Introduction 6 Cooling system Cooling is provided by the two Advanced Cooling Modules (ACMs) located at the rear of the enclosure. Each of the ACM units contain two variable speed fans. The enclosure requires four fans for normal operation, but will operate correctly when one fan fails to function...
Page 17 - Enclosure Services Module
7 I/O modules There are two I/O option slots located at the rear of the enclosure. One of these must contain an Enclosure Services Module (ESM) or a Concentrator Services module (CSM) and the other slot must contain the Terminating Services Module (TSM) or a second Concentrator Services Module (CSM)...
Page 18 - Terminating Services Module
1 Introduction 8 Terminating Services Module The Terminating Services Module (TSM) has no external connectors and as such cannot have cables connected to it. Instead it can either terminate or join the SCSI busses based on the cable configuration on the ESM. The TSM reports status and receives contr...
Page 19 - Installation; precautions
Page 21 - ESD precautions
11 ESD precautions Note: Before you install or operate the Altos S300 series enclosure, we recommend that you read the following instructions. Electrostatic discharge (ESD) can damage your processor, disk drives, expansion boards, and other components. Always observe the following precautions before...
Page 22 - Safety precautions
2 Installation precautions 12 Safety precautions Always observe the following before you install or operate the Altos S300. For language translations of these statements refer to Appendix B. 1. This device is intended for installation in a restricted access location only. 2. If any of the components...
Page 23 - Unpacking and initial setup
13 Unpacking and initial setup Carefully unpack the carton and remove the contents. If the exterior packaging or items are missing or damaged, contact your dealer immediately. Note: The disk drives are packaged in anti-static packaging, precautions must be observed prior to removal.
Page 24 - Rack installation precautions; Environmental consideration; Ambient temperature; Air flow; Electrical consideration
2 Installation precautions 14 Rack installation precautions Before installing the Altos S300 series enclosure in an equipment rack, it is essential that the following guidelines are complied with, to ensure the safe and efficient operation of the system. The Altos S300 series can be installed in ope...
Page 25 - Circuit overloading; Mechanical consideration; Mechanical loading
15 Circuit overloading Care should be taken to ensure that the current does not exceed the rating of the power source circuitry. This includes cabling, power distribution units, filters and any other devices through which the main current flows. The electrical power rating of the enclosure is 100 - ...
Page 27 - Cabling and; configuration
Page 29 - Altos S300 series SCSI ID assignments
19 Altos S300 series SCSI ID assignments The SCSI ID’s for the Altos S300 series enclosure are hard set and cannot be changed in any way. The Altos S300 series enclosure has two modes of operation: Single (Joined) SCSI bus mode (1x14), and Dual (Split) SCSI bus mode (1x7 and 1x7). The I/O Modules ar...
Page 30 - TSM LED
3 Cabling and configuration 20 I/O module LEDs There are LEDs mounted on the ESM, CSM and TSM. This section will explain what these LEDs mean. ESM/CSM LEDs TSM LED Bus A Bus B Bus A Bus B ES Activity ES Activity There are 5 LEDs in total on the ESM/CSM located as shown. The ES Activity LED shows, if...
Page 32 - Single ESM and TSM configuration; Cabling the single (joined) SCSI bus configuration
3 Cabling and configuration 22 Single ESM and TSM configuration This configuration can be cabled as either a Single (Joined) SCSI Bus or as a Dual (Split) SCSI Bus configuration. Cabling the single (joined) SCSI bus configuration One host cable is required for this configuration. The length of the h...
Page 33 - Cabling the dual (split) SCSI bus configuration
23 The Bus A LED will be ON 1 to indicate that all disks are on Bus A. The Environmental Services (ES) LED is ON for the TSM in this example to show that its ES block is the active block. Note: Both I/O modules are at ID 15. Only one module will be active at any one time and the other will be in sta...
Page 35 - Single CSM and TSM Configuration
25 Single CSM and TSM Configuration This configuration can be cabled as either a Single (Joined) SCSI Bus or as a Dual (Split) SCSI Bus configuration. Cabling the single (joined) SCSI bus configuration One host cable is required for this configuration. The length of the host cable may be a maximum o...
Page 38 - Dual CSM configuration; Dual concentrator services modules
3 Cabling and configuration 28 Dual CSM configuration For this dual CSM configuration, there must be a Concentrator Services Module (CSM) installed in both I/O Option Slots. Dual concentrator services modules Four host cables are required for this configuration. These cables must not exceed 25 meter...
Page 40 - Join/Split bus jumper
3 Cabling and configuration 30 Join/Split bus jumper The ESM/CSM has a jumper located on it that forces the SCSI bus into joined or split mode. This jumper is located on the ESM/CSM PCB at location JP10. To access the jumper: 1. Remove the ESM/CSM from the enclosure. 2. Remove the top cover from the...
Page 41 - Altos S300 series jumper settings; Power up; Remote start up
31 Powering on the Altos S300 series enclosure This section describes how the Altos S300 series enclosure is powered on. Jumpers installed on the I/O modules determine how the enclosure powers up and how the disk drives spin up. The following section describe the jumper settings. Altos S300 series j...
Page 42 - Delayed Start; Powering on an AC enclosure
3 Cabling and configuration 32 Delayed Start If you select this option, the disk drives will spin up sequentially i.e. not all together. To enable this feature, install a jumper at location JP11 on the ESM and CSM (whichever is installed). If two CSMs are installed, the jumper should be installed on...
Page 43 - System; monitoring
Page 45 - Overview
35 Overview The Altos S300 series enclosure uses LEDs and an audible alarm to report the enclosure status. The LEDs are located on the enclosure modules such as the disk drive carriers, Advanced Cooling Modules (ACM), power supply modules, and enclosure front LED panel. The enclosure status is monit...
Page 48 - Alarm buzzer mute
4 System monitoring 38 Alarm buzzer mute The alarm buzzer can be muted by pressing the alarm mute button located on the rear of the enclosure. 1 2 1 2 0 I 0 I Alarm Mute Button Mute
Page 49 - Enclosure front panel LEDs
39 Enclosure front panel LEDs The Altos S300 series enclosure has three LEDs on the front panel.. These LEDs display information about the enclosure as described in the following table: Description Color Indication LED 1 Power On Green Normally ON, indicated power is applied to the enclosure. OFF, i...
Page 50 - Disk drive carrier LEDs
4 System monitoring 40 Disk drive carrier LEDs Each of the 14 disk drive carriers have two LEDs - green and bicolor, indicators visible from the front of the enclosure. Green LED is the disk drive ready LED. The disk drive has control over this LED. While bicolor LED is controlled by the Altos S300 ...
Page 52 - Power supply LEDs
4 System monitoring 42 Power supply LEDs The Altos S300 series power supply provides power factor correction, over current and over voltage protection. The power supply has 853 Watts peak power with 673 Watts continuous power and input voltage fail detection. The power supply has two LED indicators,...
Page 55 - Installing and removing; components
Page 57 - Location of the Components
47 Location of the Components Warning! The module handles are to facilitate the easy insertion and removal of the modules, they should not be used to lift and/or carry the enclosure. 1 2 1 2 0 I 0 I Mute Disk Drives Enclosure LEDs ACMs Fans 1 & 2 Fans 3 & 4 Power Supplies PSU 1 PSU 2 I/O Mod...
Page 59 - Installing a disk drive carrier; Removing a disk drive carrier
49 Installing a disk drive carrier 1. Select the disk drive slot into which the disk drive carrier is to be installed and remove the carrier blank, if there is one installed. 2. Orient the disk drive carrier such that the LEDs are on the top. 3. With the cam lever fully open, slide the carrier into ...
Page 60 - Installing a Power Supply; Removing a Power Supply
5 Installing and removing components 50 Installing and removing a power supply The power supplies are located in the rear of the enclosure. Follow these procedures to install and remove the power supplies. Installing a Power Supply 1. Select the power supply slot into which the power supply is to be...
Page 61 - Installing an advanced cooling module (ACM); Removing an advanced cooling module (ACM)
51 Installing and removing an advanced cooling module (ACM) The advanced cooling modules are located in the rear of the enclosure. Follow these procedures to install and remove the advanced cooling modules. Warning! Fans continue to rotate after removal of power from the ACM for approximately fiftee...
Page 62 - Installing an I/O option module
5 Installing and removing components 52 Installing and removing an I/O option module The I/O option modules (ESM and TSM) are located in the rear of the enclosure. Follow these procedures to install and remove the module. Installing an I/O option module 1. Power off the host system and enclosure. 2....
Page 63 - Appendix A: Technical; specifications
Page 69 - statements
Page 77 - Index
67 Index A about Altos S300 3 advanced cooling modules 43 install 51 remove 51 advanced cooling modules, 50 air flow, 14 alarm buzzer 38 altitude 56 ambient 14 approvals agency 57 regulatory 57 C cable length 55 cabling 21 circuit overloading, 15 concentrator services module 8 Cooling 6 cooling adva...