3M PC3 - Manual
3M PC3 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – Mounting Unjacketed/900
- Page 3 – ends with white light only.; Safety glasses should be worn when working with optical fibers.
- Page 6 – Using the ruler supplied in the field kit, measure and mark the
- Page 7 – BUFFER REMOVAL
- Page 10 – THREAD THE CONNECTOR ONTO THE FIBER
- Page 11 – SECURE THE STRAIN RELIEF BOOT; For SC Connectors; EPOXY CURING; Do not score the fiber before the epoxy is cool and hard.
- Page 12 – CAREFULLY REMOVE THE LOAD ADAPTER
- Page 13 – SECTION E; See Section F to achieve >40 dB Return Loss.; PREPARE THE 5
- Page 14 – PERFORM THE 5; m lapping acetate can be cleaned with isopropyl
- Page 16 – SECTION F; PREPARE THE POLISHING SURFACE
- Page 18 – m FINISH; orientation and inspect again.
- Page 19 – PREPARE TO PERFORM THE FINAL POLISH
- Page 24 – M Telecom Systems Group; Important Notice; SECTION J; DESCRIPTION
Instructions
SC & FC/PC3 Pull-Proof
Fiber Optic Connectors
Termination Procedures for
Single-mode and Multimode
Field-Mountable Connectors
using Epoxy
Issue 1, May 1993
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
2 Contents: A) Warnings, Recommendations and Overview ................................................................................................ 3 B) Jacketed Cable Preparation ........................................................................................................................
3 SECTION A Warnings, Recommendations and Overview 1. Most fibers can be mechanically stripped without the aid of chemicals or heat. If the fiber is not mechanicallystrippable, contact 3M's Training Department or the cable manufacturer for their recommendations. 2. The recommended cleaning solvent f...
6 SECTION B Jacketed Cable Preparation 5. SLIP THE STRAIN RELIEF BOOT AND THE CORRECT CRIMPRING ONTO THE CABLE DO NOT FORGET TO DO THIS STEP. The boot will not fit over amounted connector assembly so it is essential that it be slippedonto the cable at this time. Slip the smaller diameter of the boot...